PG&E ROCKLIN SEISMIC + BUILDING ENVELOPE UPGRADES PACKAGE
Scope · HVAC / mechanical
Matches your search for HVAC in Placer County, Placer County. HVAC / mechanical. Looks like a high job at plan check / design stage. Source document: “TING OF JOINT ASSEMBLY AT EXTERIOR CONCRETE PANELS - FINAL REVIEW BY INTERWEST 03/22/2022. -BH - Warehouse TI Fencing score 47: Medium scope, unknown subcontractor likelihood, low opportunity size, unknown stage. Concret”.
Advanced detailssize, stage, dossier, evidence, contacts
- Opportunity Size
- High
- Project Stage
- Plan check / design
- Subcontractor Likelihood
- High
- Recommended Action
- Research the developer or general contractor for PG&E ROCKLIN SEISMIC...
Project Summary
Foundation, Re-roof, HVAC — Placer County, Placer County.
Current stage: Plan check / design.
Source record: “known subcontractor likelihood, low opportunity size, unknown stage. Concret”
Likely Scope
Why a hvac contractor should care
- - Source document: “TING OF JOINT ASSEMBLY AT EXTERIOR CONCRETE PANELS - FINAL REVIEW BY INTERWEST 03/22/2022. -BH - Warehouse TI Fencing score 47: Medium scope, unknown subcontractor likelihood, low opportunity size, unknown stage. Concret”
- - Source document: “THIS PROJECT IS BEING PHASED Scope includes all seismic upgrades required for existing 71,355 SF vacant building at 3625 Cincinnati Ave, Rocklin, CA. Seismic upgrades will inclu”
- - Source record: “known subcontractor likelihood, low opportunity size, unknown stage. Concret”
Who should I call?
Contact not identified yet
Why this contact?
Research a direct phone for Unknown decision maker before calling about PG&E ROCKLIN SEISMIC + BUILDING ENVELOPE UPGRADES PACKAGE.
No direct phone yet. No human contact or access route is known yet. Keep as an opportunity and research the awarding company.
Timeline
- Current Stage
- Plan check / design
- Project Status
- Needs research before outreach
- Bid Status
- Low
- Recommended Outreach Timing
- Early intro call before bidding starts
Project Dossier
- What Is Being Built
- Foundation, Re-roof, HVAC
- Procurement Path
- GC Relationship
Scope Summary
Foundation; Re-roof; HVAC
Identified Quantities
- 71,355 SF — THIS PROJECT IS BEING PHASED Scope includes all seismic upgrades required for existing 71,355 SF vacant building at 3625
- 71,355 SF — NR THIS PROJECT IS BEING PHASED Scope includes all seismic upgrades required for existing 71,355 SF vacant building at 3
Timeline
No bid or construction dates extracted from available documents yet.
Supporting Evidence
“TING OF JOINT ASSEMBLY AT EXTERIOR CONCRETE PANELS - FINAL REVIEW BY INTERWEST 03/22/2022. -BH - Warehouse TI Fencing score 47: Medium scope, unknown subcontractor likelihood, low opportunity size, unknown stage. Concret”
Source: Opportunity / permit record
“THIS PROJECT IS BEING PHASED Scope includes all seismic upgrades required for existing 71,355 SF vacant building at 3625 Cincinnati Ave, Rocklin, CA. Seismic upgrades will inclu”
Source: Opportunity / permit record
“NR THIS PROJECT IS BEING PHASED Scope includes all seismic upgrades required for existing 71,355 SF vacant building at 3625 Cincinnati Ave, Rocklin, CA. Seismic upgrades will inclu”
Source: Opportunity / permit record
“at 3625 Cincinnati Ave, Rocklin, CA. Seismic upgrades will include: new braces frames; new columns/foundations to strengthen roof framing; re-nail roof diaphragm; connections between roof member thro”
Source: Opportunity / permit record
What the records show
2 related source-backed evidence record(s) connected: Placer County Active Building Permits, Contractor Opportunity Record.
Related development: Unknown
Primary objective: Work indicated: Residential development infrastructure, Roofing, Mechanical. Primary scope: HVAC / mechanical. Source: permit or opportunity record.
- - Placer County Active Building Permits: BLD21-03502-6056 Warehouse TI
- - Contractor Opportunity Record: PG&E ROCKLIN SEISMIC + BUILDING ENVELOPE UPGRADES PACKAGE
Backup contact route
No backup phone on file. Try: GC or developer on the permit.