Find work worth calling on

Search results: Site Work

Sources

Popular Searches

Jobs you can pursue

13 site work jobs · Filtered to 1

Filtered from the full site work inventory for this search.

0 ready to call · 0 need a little research · 1 research only

Start with MASTER PLAN Placer Vineyards 1A - 2756 Plan #11 in Roseville. Contact details are on the card below.

MASTER PLAN Placer Vineyards 1A - 2756 Plan #11

Scope · Solar / electrical

Matches your search for Site Work in Roseville, Placer County. Solar / electrical. Looks like a very high job at plan check / design stage. Source document: “SYSTEM B: 3.60 KW DC: (9) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (9) (9) IQ7PLUS-72-2-US - Single Family < 3000 Fencing score 76: Major scope, high subcontractor likelihood, very high opportunity size, unknown stage. Fenci”.

No phone on file yet
Advanced detailssize, stage, dossier, evidence, contacts
Needs researchDevelopment / LargeResearch onlyCommercial / trade packageSite work · Roseville, Placer County
Opportunity Size
Very High
Project Stage
Plan check / design
Subcontractor Likelihood
High
Recommended Action
Research the developer or general contractor for MASTER PLAN Placer V...

Project Summary

Foundation, Electrical, Site work — Roseville, Placer County.

Current stage: Plan check / design.

Source record: “Foundation; Electrical (152 SQ Ft); Site work”

Likely Scope

FoundationUtilities

Why a site work contractor should care

  • - Source document: “SYSTEM B: 3.60 KW DC: (9) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (9) (9) IQ7PLUS-72-2-US - Single Family < 3000 Fencing score 76: Major scope, high subcontractor likelihood, very high opportunity size, unknown stage. Fenci”
  • - Source document: “A - 2756 Plan #11 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2756 Plan #11 Living: 2756 SQ Ft 1-Car Garage: 246 SQ Ft 2-Car Garage: 493 SQ Ft Covered Porch “A” & “C”: 52”
  • - Source record: “Foundation; Electrical (152 SQ Ft); Site work”

Who should I call?

Contact not identified yet

Why this contact?

Research a direct phone for Unknown decision maker before calling about MASTER PLAN Placer Vineyards 1A - 2756 Plan #11.

No direct phone yet. No human contact or access route is known yet. Keep as an opportunity and research the awarding company.

Timeline

Current Stage
Plan check / design
Project Status
Needs research before outreach
Bid Status
Low
Recommended Outreach Timing
Early intro call before bidding starts

Project Dossier

What Is Being Built
Foundation, Electrical, Site work
Procurement Path
GC Relationship

Scope Summary

Foundation; Electrical (152 SQ Ft); Site work

Identified Quantities

  • 2756 SQ FtA - 2756 Plan #11 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2756 Plan #11 Living: 2756 SQ Ft 1-Car Garage: 246 SQ F
  • 246 SQ FtU VB MASTER PLAN Placer Vineyards 1A - 2756 Plan #11 Living: 2756 SQ Ft 1-Car Garage: 246 SQ Ft 2-Car Garage: 493 SQ Ft
  • 493 SQ FtVineyards 1A - 2756 Plan #11 Living: 2756 SQ Ft 1-Car Garage: 246 SQ Ft 2-Car Garage: 493 SQ Ft Covered Porch “A” & “C”:
  • 52 SQ Ftg: 2756 SQ Ft 1-Car Garage: 246 SQ Ft 2-Car Garage: 493 SQ Ft Covered Porch “A” & “C”: 52 SQ Ft Covered Porch “D”: 78 SQ
  • 78 SQ Ft246 SQ Ft 2-Car Garage: 493 SQ Ft Covered Porch “A” & “C”: 52 SQ Ft Covered Porch “D”: 78 SQ Ft Covered Patio: 152 SQ Ft

Timeline

No bid or construction dates extracted from available documents yet.

Supporting Evidence

  • SYSTEM B: 3.60 KW DC: (9) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (9) (9) IQ7PLUS-72-2-US - Single Family < 3000 Fencing score 76: Major scope, high subcontractor likelihood, very high opportunity size, unknown stage. Fenci

    Source: Opportunity / permit record

  • A - 2756 Plan #11 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2756 Plan #11 Living: 2756 SQ Ft 1-Car Garage: 246 SQ Ft 2-Car Garage: 493 SQ Ft Covered Porch “A” & “C”: 52

    Source: Opportunity / permit record

  • U VB MASTER PLAN Placer Vineyards 1A - 2756 Plan #11 Living: 2756 SQ Ft 1-Car Garage: 246 SQ Ft 2-Car Garage: 493 SQ Ft Covered Porch “A” & “C”: 52 SQ Ft Covered Porch “D”:

    Source: Opportunity / permit record

  • PV SYSTEM (7 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF

    Source: Opportunity / permit record

What the records show

2 related source-backed evidence record(s) connected: Placer County Active Building Permits, Contractor Opportunity Record.

Related development: Related residential development identified

Primary objective: Enable future residential construction.

Open source evidence

Backup contact route

No backup phone on file. Try: GC or developer on the permit.