Find work worth calling on

Search results: Opportunities starting within 90 days

Sources

Popular Searches

Jobs you can pursue

30 jobs · Filtered to 3

Filtered from the full inventory for this search.

3 ready to call · 0 need a little research · 0 research only

Start with SOLAR : AREA: R07: GERBER CREEK UNIT 2 - 2793 Elevation A- Lot 9 in LOT# 9. Contact details are on the card below.

SOLAR : AREA: R07: GERBER CREEK UNIT 2 - 2793 Elevation A- Lot 9

Scope · Solar / electrical

Matches your search for Opportunities starting within 90 days in LOT# 9, Sacramento County. Solar / electrical. Looks like a very high job at open / active stage. Source document: “92], Panels [12]. Master Plan Number: MPCR2025-00003 - Residential/Single-Family/Duplex - Production Housing Electrical score 82: Large scope, high subcontractor likelihood, high opportunity size, open stage. Electrical”.

(916) 746-8515Lennar Sacramento Division (Lennar Homes of California) · Lennar Homes of California
Advanced detailssize, stage, dossier, evidence, contacts
Ready to callDevelopment / LargeHas phoneSubdivision / housingElectrical · LOT# 9, Sacramento County
Opportunity Size
Very High
Project Stage
Open / active
Subcontractor Likelihood
High
Recommended Action
Contact Lennar Homes of California about electrical work on SOLAR : A...

Project Summary

Foundation, Flatwork, Driveway — LOT# 9, Sacramento County.

Current stage: Open / active.

Source record: “ngle-Family/Duplex - Production Housing Electrical score 82: Large scope, high subcontractor likelihood, high”

Developer: Lennar Homes of California

Likely Scope

FoundationFlatworkDrivewaysUtilitiesRetaining WallsElectrical

Why a electrical contractor should care

  • - Source document: “92], Panels [12]. Master Plan Number: MPCR2025-00003 - Residential/Single-Family/Duplex - Production Housing Electrical score 82: Large scope, high subcontractor likelihood, high opportunity size, open stage. Electrical”
  • - Source document: “SOLAR : AREA: R07: GERBER CREEK UNIT 2 - 2793 Elevation A- Lot 9 SOLAR : AREA: R07: GERBER CREEK UNIT 2 - 2793”
  • - Source record: “ngle-Family/Duplex - Production Housing Electrical score 82: Large scope, high subcontractor likelihood, high”

Who should I call?

Lennar Sacramento Division (Lennar Homes of California)

Role
Developer Procurement
Company
Lennar Homes of California
Phone
(916) 746-8515
Second contact
Lennar Sacramento New Home Consultant (Lennar Homes of California) · (916) 304-9711

Why this contact?

Lennar Sacramento Division (Lennar Homes of California) (Developer Procurement) is the developer-side contact with a phone on file.

Timeline

Current Stage
Open / active
Project Status
Ready to pursue
Bid Status
Medium
Recommended Outreach Timing
Call this week

Project Dossier

What Is Being Built
Foundation, Flatwork, Driveway
Procurement Path
GC Relationship

Scope Summary

Foundation; Flatwork; Driveway; Retaining wall; HVAC

Timeline

No bid or construction dates extracted from available documents yet.

Best Contact

Lennar Homes of California · Developer

Supporting Evidence

  • 92], Panels [12]. Master Plan Number: MPCR2025-00003 - Residential/Single-Family/Duplex - Production Housing Electrical score 82: Large scope, high subcontractor likelihood, high opportunity size, open stage. Electrical

    Source: Opportunity / permit record

  • SOLAR : AREA: R07: GERBER CREEK UNIT 2 - 2793 Elevation A- Lot 9 SOLAR : AREA: R07: GERBER CREEK UNIT 2 - 2793

    Source: Opportunity / permit record

  • D GARAGE, (26) S.F. PORCH, (193) S.F. COVERED PATIO, Solar PV System; Plan [2793A], Option [1], KWDC [4.92], Panels [12]. Master Plan Number: MPCR2025-00003 - Residential/Single-Family/Duplex - Production Housing Elect

    Source: Opportunity / permit record

  • lity Certification, Issued by the Executive Officer on 14 July 2023 Riggs, Rodney; Riggs Residence Foundation Repair Project WDID 5B05CR00077, Water Quality Certification, Issued by the Executive Of

    Source: Central Valley Regional Water Quality Control Board: 401 Water Quality Certifications - Lennar Gerber Creek

What the records show

6 related source-backed evidence record(s) connected: Sacramento County Permits, Contractor Opportunity Record, Central Valley Regional Water Quality Control Board, Sacramento County Board of Supervisors, Lund Construction Co project portfolio, Southgate Recreation and Park District.

Related development: Related residential development identified

Primary objective: Enable drainage, utility, or site infrastructure improvements.

Open source evidence
Developer
Lennar Homes of California
Location
LOT# 9, Sacramento County

Backup contact route

Lennar Sacramento Division, Regional Office - (916) 746-8515

Lennar Homes of California · Regional

(916) 746-8515Source

Directory lists Lennar Homes in Roseville with office address and phone number.

SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevation B-Lot 9

Scope · Solar / electrical

Matches your search for Opportunities starting within 90 days in LOT# 9, Sacramento County. Solar / electrical. Looks like a very high job at open / active stage. Source document: “(4.10) Panels (10) Master Plan Number MPCR2025-00035 - Residential/Single-Family/Duplex - Production Housing Electrical score 49: Medium scope, unknown subcontractor likelihood, medium opportunity size, open stage. Elec”.

(925) 766-5163FDC NOR-CAL CORP · FDC NOR-CAL CORP
Advanced detailssize, stage, dossier, evidence, contacts
Ready to callDevelopment / LargeHas phoneSubdivision / housingElectrical · LOT# 9, Sacramento County
Opportunity Size
Very High
Project Stage
Open / active
Subcontractor Likelihood
High
Recommended Action
Contact FDC NOR-CAL CORP about electrical work on SOLAR : AREA: R03:...

Project Summary

Electrical — LOT# 9, Sacramento County.

Current stage: Open / active.

Source record: “ngle-Family/Duplex - Production Housing Electrical score 49: Medium scope, unknown subcontractor likelihood, m”

GC: FDC NOR-CAL CORP

Likely Scope

UtilitiesElectrical

Why a electrical contractor should care

  • - Source document: “(4.10) Panels (10) Master Plan Number MPCR2025-00035 - Residential/Single-Family/Duplex - Production Housing Electrical score 49: Medium scope, unknown subcontractor likelihood, medium opportunity size, open stage. Elec”
  • - Source document: “SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevation B-Lot 9 SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevat”
  • - Source record: “ngle-Family/Duplex - Production Housing Electrical score 49: Medium scope, unknown subcontractor likelihood, m”

Who should I call?

FDC NOR-CAL CORP

Role
General Contractor Office
Company
FDC NOR-CAL CORP
Phone
(925) 766-5163

Why this contact?

FDC NOR-CAL CORP (General Contractor Office) is the GC-side contact with a phone on file.

Timeline

Current Stage
Open / active
Project Status
Ready to pursue
Bid Status
Medium
Recommended Outreach Timing
Call this week

Project Dossier

What Is Being Built
Electrical
Procurement Path
GC Relationship

Scope Summary

Electrical

Identified Quantities

  • 2704 SFon B-Lot 9 SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevation B-Lot 9 - Production Home 2704 SF -SFD (2) Story -(3) Be
  • 2704 SF-CAL CORP SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevation B-Lot 9 - Production Home 2704 SF -SFD (2) Story -(3) Bed
  • 2704 SFn Housing SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevation B-Lot 9 - Production Home 2704 SF -SFD (2) Story -(3) Bed

Timeline

No bid or construction dates extracted from available documents yet.

Best Contact

FDC NOR-CAL CORP · General Contractor

Supporting Evidence

  • (4.10) Panels (10) Master Plan Number MPCR2025-00035 - Residential/Single-Family/Duplex - Production Housing Electrical score 49: Medium scope, unknown subcontractor likelihood, medium opportunity size, open stage. Elec

    Source: Opportunity / permit record

  • SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevation B-Lot 9 SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevat

    Source: Opportunity / permit record

  • ) Covered Porch-(233sf) Covered patio Solar PV System Plan (2704 Elevation B ) Option (Layout 3) KWDC (4.10) Panels (10) Master Plan Number MPCR2025-00035 - Residential/Single-Family/Duplex - Production Housing Electri

    Source: Opportunity / permit record

  • on B-Lot 9 SOLAR : AREA: R03: Blossom Ridge-Plan 2704-Elevation B-Lot 9 - Production Home 2704 SF -SFD (2) Story -(3) Bedroom (2) Bath -(723sf) Garage-(135sf) Covered Porch-(233sf)

    Source: Opportunity / permit record

What the records show

2 related source-backed evidence record(s) connected: Sacramento County Permits, Contractor Opportunity Record.

Related development: Related residential development identified

Primary objective: Enable future residential construction.

Open source evidence
General Contractor
FDC NOR-CAL CORP
Location
LOT# 9, Sacramento County

Backup contact route

FDC NOR-CAL CORP, General Contractor - (925) 766-5163

FDC NOR-CAL CORP · Construction

(925) 766-5163Source

Source-backed company phone listed for FDC NOR-CAL CORP.

NEW (GATES) - 7575 POWER INN RD

Scope · Electrical: Utilities, Electrical

Matches your search for Opportunities starting within 90 days in APT# 1, Sacramento County. Electrical: Utilities, Electrical. Looks like a high job at open / active stage. Source document: “New Building or Addition, Commercial Coach, Ground Mount Solar, Light Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor likelihood, medium opportunity size, open stage. Elec”.

(916) 599-6629ALLTECH GATES AND ENTRY CONTROLS INC · ALLTECH GATES AND ENTRY CONTROLS INC
Advanced detailssize, stage, dossier, evidence, contacts
Ready to callCommercial packageHas phoneCommercial / trade packageElectrical · APT# 1, Sacramento County
Opportunity Size
High
Project Stage
Open / active
Subcontractor Likelihood
High
Recommended Action
Call ALLTECH GATES AND ENTRY CONTROLS INC about electrical work on th...

Project Summary

Electrical — APT# 1, Sacramento County.

Current stage: Open / active.

Source record: “Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor likelihood, m”

GC: ALLTECH GATES AND ENTRY CONTROLS INC

Likely Scope

UtilitiesElectrical

Why a electrical contractor should care

  • - Source document: “New Building or Addition, Commercial Coach, Ground Mount Solar, Light Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor likelihood, medium opportunity size, open stage. Elec”
  • - Source document: “ncing with gate operators and necessary equipment. - New Building or Addition, Commercial Coach, Ground Mount Solar, Light Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor”
  • - Source record: “Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor likelihood, m”

Who should I call?

ALLTECH GATES AND ENTRY CONTROLS INC

Role
Gate / Fence Contractor (self-perform risk)
Company
ALLTECH GATES AND ENTRY CONTROLS INC
Phone
(916) 599-6629

Why this contact?

ALLTECH GATES AND ENTRY CONTROLS INC (Gate / Fence Contractor (self-perform risk)) is the GC-side contact with a phone on file.

Timeline

Current Stage
Open / active
Project Status
Ready to pursue
Bid Status
Medium
Recommended Outreach Timing
Call this week

Project Dossier

What Is Being Built
Electrical
Procurement Path
GC Relationship

Scope Summary

Electrical

Timeline

No bid or construction dates extracted from available documents yet.

Best Contact

ALLTECH GATES AND ENTRY CONTROLS INC · General Contractor

Supporting Evidence

  • New Building or Addition, Commercial Coach, Ground Mount Solar, Light Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor likelihood, medium opportunity size, open stage. Elec

    Source: Opportunity / permit record

  • ncing with gate operators and necessary equipment. - New Building or Addition, Commercial Coach, Ground Mount Solar, Light Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor

    Source: Opportunity / permit record

  • ng or Addition, Commercial Coach, Ground Mount Solar, Light Pole Standard, Electric Vehicle Charger Electrical score 49: Medium scope, unknown subcontractor likelihood, medium opportunity size, open s

    Source: Opportunity / permit record

Source excerpts

  • NEW (GATES) - 7575 POWER INN RD - Supply and install automated slide gates, ADA ped gate and fencing with gate operators and necessary equipment.

    Source: CBNC2026-00207 Commercial

    Open source document
  • NEW (GATES) - 7575 POWER INN RD - Supply and install automated slide gates, ADA ped gate and fencing with gate operators and necessary equipment.

    Source: CBNC2026-00207 Commercial

    Open source document
  • NEW (GATES) - 7575 POWER INN RD.

    Source: CBNC2026-00207 Commercial

    Open source document

What the records show

2 related source-backed evidence record(s) connected: Sacramento County Permits, Contractor Opportunity Record.

Related development: Unknown

Primary objective: Work indicated: Utility work, Residential development infrastructure. Primary scope: Fence / gate installation. Source: permit or opportunity record.

Open source evidence
General Contractor
ALLTECH GATES AND ENTRY CONTROLS INC
Location
APT# 1, Sacramento County

Backup contact route

ALLTECH GATES AND ENTRY CONTROLS INC, General Contractor - (916) 599-6629

ALLTECH GATES AND ENTRY CONTROLS INC · Construction

(916) 599-6629 [email protected]Source

Source-backed company phone listed for ALLTECH GATES AND ENTRY CONTROLS INC.