Elk Grove Delta Solar Field
Opportunity Score
78
Project Stage
Proposed
Timeline
6-18 months
Size / Value
Large / $59,750,000
Location
Elk Grove, Sacramento County
Primary Contact
Summit Infrastructure 296
Developer / Builder
Summit Infrastructure 296 / Riverbend Development 327
Current Stage
Proposed
Updated Jun 21, 2026
Opportunity Analysis
Opportunity Score
78
Estimated timeline: 6-18 months
Reasoning
- + Project is still in a reachable stage: Proposed.
- + Large scale suggests multiple trade opportunities.
- + Infrastructure or utility activity can create site work, fencing, concrete, and electrical demand.
- + Early planning signals suggest contractor selection may still be open.
Estimated Contractor Categories
Evidence
Caveats
- - A contractor is already identified in public records.
Generated Opportunity
Generated from collected signals and supporting evidence.
Trade
Fencing
Horizon
Fast Money
Score
86
Estimated Opportunity Value
$1M+
Start Window
0-6 months
Revenue Reasoning
Confidence 55%$1,195,000 - $3,585,000
- + Based on infrastructure project type.
- + Project value is $59,750,000.
- + Fencing trade share estimated from project type and stage.
- + Current stage is Proposed.
Why This Trade
- + Residential subdivision can require perimeter, yard, or phase fencing. (74%)
Transparent Score Explanation
Base opportunity
+30A normalized public project record exists.
Evidence: ev-project-p-0186
Near-term horizon
+20Timing evidence places this in the 0-6 month Fast Money window.
Evidence: ev-permit-pm-00186, ev-permit-pm-01186, ev-permit-pm-02186, ev-permit-pm-03186, ev-permit-pm-04186, ev-signal-sig-00928
Permit evidence
+15Permit records increase confidence that work is moving toward execution.
Evidence: ev-permit-pm-00186, ev-permit-pm-01186, ev-permit-pm-02186, ev-permit-pm-03186, ev-permit-pm-04186
Planning evidence
+12Planning, land, parcel, CEQA, or utility records support the recommendation.
Evidence: ev-signal-sig-00928, ev-signal-sig-00927, ev-signal-sig-00926
Project scale
+9Large scale suggests multiple trade packages.
Evidence: ev-project-p-0186
Trade fit
+8Fencing is supported by 1 source-backed trade signal(s).
Evidence: ev-project-p-0186
Known contractor
-8A contractor is already named, so outreach should verify whether this scope remains open.
Evidence: ev-project-p-0186
Who To Contact
| Company | Contact | Phone | Website | Role | Confidence | Source | |
|---|---|---|---|---|---|---|---|
| Summit Infrastructure 296 | Not listed | (916) 555-1295 | [email protected] | Open | Developer | 78% | Builder active in Sacramento County. |
| Riverbend Development 327 | Not listed | (919) 555-1326 | [email protected] | Open | Builder | 78% | General Contractor active in Placer County. |
| Delta Engineering 358 | Not listed | Not listed | [email protected] | Open | General Contractor | 78% | Architect active in El Dorado County. |
| North Valley Works 389 | Not listed | (925) 555-1388 | [email protected] | Open | Architect | 78% | Engineer active in Nevada County. |
| Civic Industrial 420 | Not listed | (928) 555-1419 | [email protected] | Open | Engineer | 78% | Specialty Contractor active in Yuba County. |
Next Action
Contact Summit Infrastructure 296 and verify whether the trade package is still open.
- + Fast Money horizon was selected from project stage Proposed and 11 supporting evidence records.
- + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
- + At least one source-supported contact is available.
Confidence Breakdown
Resolution confidence 65%Permit Evidence
86%5 permit record(s) support the opportunity.
Planning Evidence
76%Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.
Bid Evidence
0%No SAM.gov bid evidence attached.
Source Agreement
95%4 independent source family/families attached. Confidence increases when multiple sources agree.
Contacts
Developer
Builder
General Contractor
Delta Engineering 358
Architect - General Contractor
Architect
Engineer
Signals
Opportunity indicators detected before, during, and after permits.
| Signal | Date | Importance | Description | Source |
|---|---|---|---|---|
| Infrastructure Project | Apr 19, 2026 | 71 | Infrastructure Project detected for Elk Grove Delta Solar Field. This may indicate upcoming contractor opportunity around infrastructure scope. | Sacramento Public Records |
| Groundbreaking | Mar 18, 2026 | 63 | Groundbreaking detected for Elk Grove Delta Solar Field. This may indicate upcoming contractor opportunity around infrastructure scope. | Sacramento Public Records |
| Subdivision Filing | Feb 17, 2026 | 55 | Subdivision Filing detected for Elk Grove Delta Solar Field. This may indicate upcoming contractor opportunity around infrastructure scope. | Sacramento Public Records |
Permits
Supporting records, searchable and sortable.
| SAC-27-12185 | Grading | Jun 12, 2026 | $5,975,000 | Pending |
| SAC-27-13185 | Grading | Apr 13, 2026 | $11,950,000 | In Review |
| SAC-27-10185 | Grading | Apr 10, 2026 | $4,780,000 | In Review |
| SAC-27-14185 | Grading | Feb 14, 2026 | $7,170,000 | Issued |
| SAC-27-11185 | Grading | Feb 11, 2026 | $10,755,000 | Issued |
Documents
| Title | Type | Date | Source |
|---|---|---|---|
| Elk Grove Delta Solar Field Planning Staff Report | Staff Report | Apr 13, 2026 | Open source |
| Elk Grove Delta Solar Field Site Plan Package | Site Plan | May 14, 2026 | Open source |
Timeline
- Planning
- Proposed
- Approved
- Permitted
- Under Construction
- Completed
Evidence Panel
Elk Grove Delta Solar Field
Infrastructure project in Elk Grove with public records indicating contractor-relevant scope, site work, utility coordination, and trade opportunities.
project - Sacramento Public Records - confidence 72%
Grading SAC-27-10185
In Review permit dated 2026-04-10.
permit - Permit record - confidence 86%
Grading SAC-27-11185
Issued permit dated 2026-02-11.
permit - Permit record - confidence 86%
Grading SAC-27-12185
Pending permit dated 2026-06-12.
permit - Permit record - confidence 86%
Grading SAC-27-13185
In Review permit dated 2026-04-13.
permit - Permit record - confidence 86%
Grading SAC-27-14185
Issued permit dated 2026-02-14.
permit - Permit record - confidence 86%
Infrastructure Project
Infrastructure Project detected for Elk Grove Delta Solar Field. This may indicate upcoming contractor opportunity around infrastructure scope.
signal - Sacramento Public Records - confidence 71%
Groundbreaking
Groundbreaking detected for Elk Grove Delta Solar Field. This may indicate upcoming contractor opportunity around infrastructure scope.
signal - Sacramento Public Records - confidence 63%
Subdivision Filing
Subdivision Filing detected for Elk Grove Delta Solar Field. This may indicate upcoming contractor opportunity around infrastructure scope.
signal - Sacramento Public Records - confidence 55%
Elk Grove Delta Solar Field Planning Staff Report
Scope summary, conditions of approval, and agency comments.
document - Staff Report - confidence 76%
Elk Grove Delta Solar Field Site Plan Package
Plan sheets showing access, utilities, structures, and site improvements.
document - Site Plan - confidence 76%