HAM - ENERGY STORAGE
Opportunity Score
73
Project Stage
Permitted
Timeline
0-6 months
Size / Value
Small / Undisclosed
Location
Placer County, Placer County
Primary Contact
No contact information available
Developer / Builder
No developer / No builder
Current Stage
Permitted
Updated Jul 5, 2026
Opportunity Analysis
Opportunity Score
73
Estimated timeline: 0-6 months
Reasoning
- + Project is still in a reachable stage: Permitted.
- + Permit activity suggests work may be approaching start.
- + No known general contractor is attached in public records.
Estimated Contractor Categories
Evidence
Generated Opportunity
Generated from collected signals and supporting evidence.
Trade
Fencing
Horizon
Fast Money
Score
93
Estimated Opportunity Value
Not estimated
Start Window
0-6 months
Revenue Reasoning
Confidence 20%Not estimated
- + No permit valuation or project value was available in the supporting evidence.
Why This Trade
- + Outdoor storage area suggests fencing or security perimeter scope. (80%)
Transparent Score Explanation
Base opportunity
+30A normalized public project record exists.
Evidence: ev-project-placer-bld20-02032-6046, placer-evidence-bld20-02032-6046
Near-term horizon
+20Timing evidence places this in the 0-6 month Fast Money window.
Evidence: ev-permit-placer-permit-bld20-02032-6046, ev-signal-placer-signal-bld20-02032-6046
Permit evidence
+15Permit records increase confidence that work is moving toward execution.
Evidence: ev-permit-placer-permit-bld20-02032-6046
Real source record
+10This recommendation is backed by a collected public source record, not only synthetic project data.
Evidence: placer-evidence-bld20-02032-6046
Trade fit
+8Fencing is supported by 1 source-backed trade signal(s).
Evidence: placer-evidence-bld20-02032-6046
Open contractor slot
+10No general contractor is attached in the available public evidence.
Evidence: ev-project-placer-bld20-02032-6046
Who To Contact
No source-supported contact information was found.
Next Action
Pull the permit packet and identify the applicant, owner, or listed contractor.
- + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
- + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
- + No source-supported contact is available; next step is source-record review rather than invented outreach.
Confidence Breakdown
Resolution confidence 95%Permit Evidence
86%1 permit record(s) support the opportunity.
Planning Evidence
0%Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.
Bid Evidence
0%No SAM.gov bid evidence attached.
Source Agreement
75%3 independent source family/families attached. Confidence increases when multiple sources agree.
Contacts
Developer
No contact information available
Builder
No contact information available
General Contractor
No contact information available
Architect
No contact information available
Engineer
No contact information available
Signals
Opportunity indicators detected before, during, and after permits.
| Signal | Date | Importance | Description | Source |
|---|---|---|---|---|
| Permit | Jul 5, 2026 | 89 | Placer County active permit BLD20-02032: HAM - ENERGY STORAGE - RESIDENTIAL ENERGY STORAGE (E) PV OUTPUT: 16 KW DC (N) ENERGY STORAGE: 54 KWh PANEL MAIN AMPERAGE: 400 MSP (SPLIT 200) PANEL CHANGEOUT: NO SYSTEM 1: (2) ESS: TESLA POWERWALL 2.0 (E) 125A GENERATION PANEL W/ 100A MCB, (2) 30A ESS BREAKERS & 35A PV BREAKER (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (N) 200A AC DISCONNECT (E) 400A MSP W/ 200A MCB SYSTEM 2: (2) ESS: TESLA POWERWALL 2.0 (N) 125A GENERATION PANEL W/ 125A MCB, (2) 30A ESS BREAKERS & (2) 30A PV BREAKERS (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (E) 400A MSP W/ 200A MCB TRENCHING: NO NULL - Electrical | Placer County Active Building Permits |
Permits
Supporting records, searchable and sortable.
| BLD20-02032 | Electrical | Jul 5, 2026 | Undisclosed | Issued |
Documents
| Title | Type | Date | Source |
|---|---|---|---|
| BLD20-02032 source record | Sacramento County permit source | Jul 5, 2026 | Open source |
Timeline
- Planning
- Proposed
- Approved
- Permitted
- Under Construction
- Completed
Evidence Panel
HAM - ENERGY STORAGE
HAM - ENERGY STORAGE - RESIDENTIAL ENERGY STORAGE (E) PV OUTPUT: 16 KW DC (N) ENERGY STORAGE: 54 KWh PANEL MAIN AMPERAGE: 400 MSP (SPLIT 200) PANEL CHANGEOUT: NO SYSTEM 1: (2) ESS: TESLA POWERWALL 2.0 (E) 125A GENERATION PANEL W/ 100A MCB, (2) 30A ESS BREAKERS & 35A PV BREAKER (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (N) 200A AC DISCONNECT (E) 400A MSP W/ 200A MCB SYSTEM 2: (2) ESS: TESLA POWERWALL 2.0 (N) 125A GENERATION PANEL W/ 125A MCB, (2) 30A ESS BREAKERS & (2) 30A PV BREAKERS (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (E) 400A MSP W/ 200A MCB TRENCHING: NO NULL - Electrical
project - Placer County Active Building Permits - confidence 72%
BLD20-02032 Electrical
HAM - ENERGY STORAGE - RESIDENTIAL ENERGY STORAGE (E) PV OUTPUT: 16 KW DC (N) ENERGY STORAGE: 54 KWh PANEL MAIN AMPERAGE: 400 MSP (SPLIT 200) PANEL CHANGEOUT: NO SYSTEM 1: (2) ESS: TESLA POWERWALL 2.0 (E) 125A GENERATION PANEL W/ 100A MCB, (2) 30A ESS BREAKERS & 35A PV BREAKER (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (N) 200A AC DISCONNECT (E) 400A MSP W/ 200A MCB SYSTEM 2: (2) ESS: TESLA POWERWALL 2.0 (N) 125A GENERATION PANEL W/ 125A MCB, (2) 30A ESS BREAKERS & (2) 30A PV BREAKERS (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (E) 400A MSP W/ 200A MCB TRENCHING: NO NULL - Electrical
source_record - Placer County Active Building Permits - confidence 82%
Electrical BLD20-02032
Issued permit dated 2026-07-05.
permit - Permit record - confidence 86%
Permit
Placer County active permit BLD20-02032: HAM - ENERGY STORAGE - RESIDENTIAL ENERGY STORAGE (E) PV OUTPUT: 16 KW DC (N) ENERGY STORAGE: 54 KWh PANEL MAIN AMPERAGE: 400 MSP (SPLIT 200) PANEL CHANGEOUT: NO SYSTEM 1: (2) ESS: TESLA POWERWALL 2.0 (E) 125A GENERATION PANEL W/ 100A MCB, (2) 30A ESS BREAKERS & 35A PV BREAKER (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (N) 200A AC DISCONNECT (E) 400A MSP W/ 200A MCB SYSTEM 2: (2) ESS: TESLA POWERWALL 2.0 (N) 125A GENERATION PANEL W/ 125A MCB, (2) 30A ESS BREAKERS & (2) 30A PV BREAKERS (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (E) 400A MSP W/ 200A MCB TRENCHING: NO NULL - Electrical
signal - Placer County Active Building Permits - confidence 89%
BLD20-02032 source record
HAM - ENERGY STORAGE - RESIDENTIAL ENERGY STORAGE (E) PV OUTPUT: 16 KW DC (N) ENERGY STORAGE: 54 KWh PANEL MAIN AMPERAGE: 400 MSP (SPLIT 200) PANEL CHANGEOUT: NO SYSTEM 1: (2) ESS: TESLA POWERWALL 2.0 (E) 125A GENERATION PANEL W/ 100A MCB, (2) 30A ESS BREAKERS & 35A PV BREAKER (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (N) 200A AC DISCONNECT (E) 400A MSP W/ 200A MCB SYSTEM 2: (2) ESS: TESLA POWERWALL 2.0 (N) 125A GENERATION PANEL W/ 125A MCB, (2) 30A ESS BREAKERS & (2) 30A PV BREAKERS (N) 200A ATS: TESLA BACKUP GATEWAY (E) 200A SUB PANEL W/ 200A MCB (E) 400A MSP W/ 200A MCB TRENCHING: NO NULL - Electrical
document - Sacramento County permit source - confidence 76%