CommercialPlacer CountyPlacer County

KOPP - UNDERGROUND ELECTRICAL SERVICE

Opportunity Score

81

Project Stage

Permitted

Timeline

0-6 months

Size / Value

Small / Undisclosed

Location

Placer County, Placer County

Primary Contact

No contact information available

Developer / Builder

No developer / No builder

Current Stage

Permitted

Updated Jul 5, 2026

Opportunity Analysis

Opportunity Score

81

Estimated timeline: 0-6 months

Reasoning

  • + Project is still in a reachable stage: Permitted.
  • + Commercial work may create HVAC, roofing, concrete, and buildout opportunities.
  • + Permit activity suggests work may be approaching start.
  • + No known general contractor is attached in public records.

Estimated Contractor Categories

HVACRoofingConcreteFencing

Evidence

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Electrical

Horizon

Fast Money

Score

97

Estimated Opportunity Value

Not estimated

Start Window

0-6 months

Revenue Reasoning

Confidence 20%

Not estimated

  • + No permit valuation or project value was available in the supporting evidence.

Why This Trade

  • + Electrical service or power upgrade appears in source text. (86%)
  • + Solar, PV, or battery scope requires electrical work. (88%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-placer-bld20-02755-5993, placer-evidence-bld20-02755-5993

Near-term horizon

+20

Timing evidence places this in the 0-6 month Fast Money window.

Evidence: ev-permit-placer-permit-bld20-02755-5993, ev-signal-placer-signal-bld20-02755-5993

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-placer-permit-bld20-02755-5993

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: placer-evidence-bld20-02755-5993

Trade fit

+12

Electrical is supported by 2 source-backed trade signal(s).

Evidence: placer-evidence-bld20-02755-5993

Open contractor slot

+10

No general contractor is attached in the available public evidence.

Evidence: ev-project-placer-bld20-02755-5993

Who To Contact

No source-supported contact information was found.

Next Action

Pull the permit packet and identify the applicant, owner, or listed contractor.

  • + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + No source-supported contact is available; next step is source-record review rather than invented outreach.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

0%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: No contact information available

Developer

No contact information available

Builder

No contact information available

General Contractor

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
PermitJul 5, 202689Placer County active permit BLD20-02755: KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - ElectricalPlacer County Active Building Permits

Permits

Supporting records, searchable and sortable.

BLD20-02755ElectricalJul 5, 2026UndisclosedIssued

Documents

TitleTypeDateSource
BLD20-02755 source recordSacramento County permit sourceJul 5, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

KOPP - UNDERGROUND ELECTRICAL SERVICE

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

project - Placer County Active Building Permits - confidence 72%

Open source

BLD20-02755 Electrical

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

source_record - Placer County Active Building Permits - confidence 82%

Open source

Electrical BLD20-02755

Issued permit dated 2026-07-05.

permit - Permit record - confidence 86%

Open source

Permit

Placer County active permit BLD20-02755: KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

signal - Placer County Active Building Permits - confidence 89%

Open source

BLD20-02755 source record

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

document - Sacramento County permit source - confidence 76%

Open source

Map