CommercialPlacer CountyPlacer County

KOPP - UNDERGROUND ELECTRICAL SERVICE

Opportunity Score

81

Project Stage

Permitted

Timeline

0-6 months

Size / Value

Small / Undisclosed

Location

Placer County, Placer County

Primary Contact

No contact information available

Developer / Builder

No developer / No builder

Current Stage

Permitted

Updated Jul 5, 2026

Contractor-facing opportunity

No source-backed phone or email yet; access route research may still make this usable. · 5 evidence record(s) attached · Location is present · Project identity is present · Some access intelligence exists, but the contractor entry path is incomplete.

Fast Money Score

94

Contact Confidence

0%

Resolution Confidence

95%

Recommended Action

Research a direct phone for Unknown decision maker before calling about KOPP - UNDERGROUND ELECTRICAL SERVICE.

Actionability

26

Contractor Score

43

Likely Scope

Electrical scope

Access Path

Unknown

Subcontractor Likelihood

Unknown

Project Stage

Open

What To Say

Hi, this is [Name] with Twin Rivers. I'm calling about KOPP - UNDERGROUND ELECTRICAL SERVICE. Who handles fence/gate subcontractor pricing for your project team?

Additional intelligence not yet discovered: developer, general contractor, phone, access path.

Scope Intelligence

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the hous…

UtilitiesPublic WorksRoads

Fence Scope

No Evidence

Fence Signal Score

0

Potential Scope

Unknown

Why Fencing Is Relevant

Primary scope is Electrical / landscape lighting. Incidental gate or fence mentions are not indicative of a bidable fencing opportunity.

No Evidence: 0 strong fence evidence signal(s), 0 weak signal(s), 0 total signal(s), 3 limiting signal(s), categories Utilities, Public Works, Roads, primary scope Electrical / landscape lighting, and only permit/opportunity metadata is available. Not bidable: Primary scope is Electrical / landscape lighting; no fencing evidence found.

Project Dossier

Document-extracted project intelligence. Evidence from source documents is preferred over permit metadata assumptions.

What Is Being Built

Electrical

Procurement Path

GC Relationship

Scope Summary

Electrical

Timeline

No bid or construction dates extracted from available documents yet.

Supporting Evidence

  • KOPP - UNDERGROUND ELECTRICAL SERVICE KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go undergr

    Source: Opportunity / permit record

    Open source
  • W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****------------------------------------------------------------------------------

    Source: Opportunity / permit record

    Open source
  • uired. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is mult

    Source: Opportunity / permit record

    Open source

Reviewed 3 source document(s). 0 remotely fetched. 1 scope item(s), 0 quantity signal(s), 3 trade evidence quote(s).

Project Dossier

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

Developer

Unknown

Applicant

Unknown

Primary Objective

Work indicated: Utility work, Site access improvements. Primary scope: Electrical / landscape lighting. Source: permit or opportunity record.

Associated Improvements

  • + Utility work
  • + Site access improvements
  • + Roads / site access

Work Categories

  • + Utility work
  • + Site access improvements

Related Development

Unknown

Why Fencing Is Relevant

Primary scope is Electrical / landscape lighting; no fencing evidence found.

No Evidence: 2 related evidence record(s), 0 positive evidence signal(s), and 1 negative evidence signal(s).

Best Available Contact

Highest-ranked source-backed route for reaching a human before falling back to procurement access.

Additional contact intelligence not yet discovered. Use the known access route or continue research before direct outreach.

Opportunity Analysis

Opportunity Score

81

Estimated timeline: 0-6 months

Fast Money score: 94

Reasoning

  • + Project is still in a reachable stage: Permitted.
  • + Commercial work may create HVAC, roofing, concrete, and buildout opportunities.
  • + Permit activity suggests work may be approaching start.
  • + No known general contractor is attached in public records.

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Electrical

Horizon

Fast Money

Score

97

Estimated Opportunity Value

Not estimated

Payment Potential

3-6 months

Revenue Reasoning

Confidence 20%

Not estimated

  • + No permit valuation or project value was available in the supporting evidence.

Why This Trade

  • + Electrical service or power upgrade appears in source text. (86%)
  • + Solar, PV, or battery scope requires electrical work. (88%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-placer-bld20-02755-5993, placer-evidence-bld20-02755-5993

Near-term horizon

+20

Timing evidence places this in the 0-6 month Fast Money window.

Evidence: ev-permit-placer-permit-bld20-02755-5993, ev-signal-placer-signal-bld20-02755-5993

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-placer-permit-bld20-02755-5993

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: placer-evidence-bld20-02755-5993

Trade fit

+12

Electrical is supported by 2 source-backed trade signal(s).

Evidence: placer-evidence-bld20-02755-5993

Open contractor slot

+10

No general contractor is attached in the available public evidence.

Evidence: ev-project-placer-bld20-02755-5993

Who To Contact

No source-supported contact information was found.

Next Action

Pull the permit packet and identify the applicant, owner, or listed contractor.

  • + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + No source-supported contact is available; next step is source-record review rather than invented outreach.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

0%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: No contact information available

Developer

No contact information available

Builder

No contact information available

General Contractor

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
PermitJul 5, 202689Placer County active permit BLD20-02755: KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - ElectricalPlacer County Active Building Permits

Permits

Supporting records, searchable and sortable.

BLD20-02755ElectricalJul 5, 2026UndisclosedIssued

Documents

TitleTypeDateSource
BLD20-02755 source recordSacramento County permit sourceJul 5, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

KOPP - UNDERGROUND ELECTRICAL SERVICE

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

project - Placer County Active Building Permits - confidence 72%

Open source

BLD20-02755 Electrical

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

source_record - Placer County Active Building Permits - confidence 82%

Open source

Electrical BLD20-02755

Issued permit dated 2026-07-05.

permit - Permit record - confidence 86%

Open source

Permit

Placer County active permit BLD20-02755: KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

signal - Placer County Active Building Permits - confidence 89%

Open source

BLD20-02755 source record

KOPP - UNDERGROUND ELECTRICAL SERVICE - Project consists of working with PG&E to go underground with our electrical service from their pole to our house. Existing electric transformer is across Ridge Road from our house. The new pole will be planted on our property on the house-side of Ridge Road so no trenching under Ridge Road is necessary. The new pole will be placed in the existing PG&E easement on our property, so no new easements are required. From that pole, we will trench ~170 feet to our house, ending at the location of our existing electric panel. The old 200A meter main will be removed, the new meter main will be upsized to 400A. The trench is multi-purpose, it will include both electric and telephone (no gas). CURRENT PANEL AMPERAGE: 200 PROPOSED PANEL AMPERAGE:N- 400A SPLIT N- 1-200A W/ E-100A BRK TO E-125A SUB PANEL TO TRANSFER SWITCH 2ND 200A BRK DERATED TO 175A W/60A E-PV W/ 100A BRK TO E-125A SUB PANEL CHANGE OUT / NEW: Change Out - Upgrade WITH PORTABLE GENERATOR AND EXISTING SOLAR PERMIT # BLD18-04691 ****-------------------------------------------------------------------------------------------------------------------------------------- REVISION 6/24/21: CHANGING MSP FROM 400A TO 200A FOR SERVICE TO HOUSE - REVIEWED RM - Electrical

document - Sacramento County permit source - confidence 76%

Open source

Map