CommercialRosevillePlacer County

MASTER PLAN Placer Vineyards 1A - 2579 Plan #10

Opportunity Score

81

Project Stage

Permitted

Timeline

0-6 months

Size / Value

Small / Undisclosed

Location

Roseville, Placer County

Primary Contact

No contact information available

Developer / Builder

No developer / No builder

Current Stage

Permitted

Updated Jul 5, 2026

Opportunity Analysis

Opportunity Score

81

Estimated timeline: 0-6 months

Reasoning

  • + Project is still in a reachable stage: Permitted.
  • + Commercial work may create HVAC, roofing, concrete, and buildout opportunities.
  • + Permit activity suggests work may be approaching start.
  • + No known general contractor is attached in public records.

Estimated Contractor Categories

HVACRoofingConcreteFencing

Evidence

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Fencing

Horizon

Fast Money

Score

93

Estimated Opportunity Value

Not estimated

Start Window

0-6 months

Revenue Reasoning

Confidence 20%

Not estimated

  • + No permit valuation or project value was available in the supporting evidence.

Why This Trade

  • + Residential subdivision can require perimeter, yard, or phase fencing. (74%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-placer-bld20-06712-6021, placer-evidence-bld20-06712-6021

Near-term horizon

+20

Timing evidence places this in the 0-6 month Fast Money window.

Evidence: ev-permit-placer-permit-bld20-06712-6021, ev-signal-placer-signal-bld20-06712-6021

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-placer-permit-bld20-06712-6021

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: placer-evidence-bld20-06712-6021

Trade fit

+8

Fencing is supported by 1 source-backed trade signal(s).

Evidence: placer-evidence-bld20-06712-6021

Open contractor slot

+10

No general contractor is attached in the available public evidence.

Evidence: ev-project-placer-bld20-06712-6021

Who To Contact

No source-supported contact information was found.

Next Action

Pull the permit packet and identify the applicant, owner, or listed contractor.

  • + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + No source-supported contact is available; next step is source-record review rather than invented outreach.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

0%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: No contact information available

Developer

No contact information available

Builder

No contact information available

General Contractor

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
PermitJul 5, 202689Placer County active permit BLD20-06712: MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000Placer County Active Building Permits

Permits

Supporting records, searchable and sortable.

BLD20-06712Single Family < 3000Jul 5, 2026UndisclosedIssued

Documents

TitleTypeDateSource
BLD20-06712 source recordSacramento County permit sourceJul 5, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

MASTER PLAN Placer Vineyards 1A - 2579 Plan #10

MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000

project - Placer County Active Building Permits - confidence 72%

Open source

BLD20-06712 Single Family < 3000

MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000

source_record - Placer County Active Building Permits - confidence 82%

Open source

Single Family < 3000 BLD20-06712

Issued permit dated 2026-07-05.

permit - Permit record - confidence 86%

Open source

Permit

Placer County active permit BLD20-06712: MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000

signal - Placer County Active Building Permits - confidence 89%

Open source

BLD20-06712 source record

MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000

document - Sacramento County permit source - confidence 76%

Open source

Map