MASTER PLAN Placer Vineyards 1A - 2579 Plan #10
Opportunity Score
81
Project Stage
Permitted
Timeline
0-6 months
Size / Value
Small / Undisclosed
Location
Roseville, Placer County
Primary Contact
No contact information available
Developer / Builder
No developer / No builder
Current Stage
Permitted
Updated Jul 5, 2026
Opportunity Analysis
Opportunity Score
81
Estimated timeline: 0-6 months
Reasoning
- + Project is still in a reachable stage: Permitted.
- + Commercial work may create HVAC, roofing, concrete, and buildout opportunities.
- + Permit activity suggests work may be approaching start.
- + No known general contractor is attached in public records.
Generated Opportunity
Generated from collected signals and supporting evidence.
Trade
Fencing
Horizon
Fast Money
Score
93
Estimated Opportunity Value
Not estimated
Start Window
0-6 months
Revenue Reasoning
Confidence 20%Not estimated
- + No permit valuation or project value was available in the supporting evidence.
Why This Trade
- + Residential subdivision can require perimeter, yard, or phase fencing. (74%)
Transparent Score Explanation
Base opportunity
+30A normalized public project record exists.
Evidence: ev-project-placer-bld20-06712-6021, placer-evidence-bld20-06712-6021
Near-term horizon
+20Timing evidence places this in the 0-6 month Fast Money window.
Evidence: ev-permit-placer-permit-bld20-06712-6021, ev-signal-placer-signal-bld20-06712-6021
Permit evidence
+15Permit records increase confidence that work is moving toward execution.
Evidence: ev-permit-placer-permit-bld20-06712-6021
Real source record
+10This recommendation is backed by a collected public source record, not only synthetic project data.
Evidence: placer-evidence-bld20-06712-6021
Trade fit
+8Fencing is supported by 1 source-backed trade signal(s).
Evidence: placer-evidence-bld20-06712-6021
Open contractor slot
+10No general contractor is attached in the available public evidence.
Evidence: ev-project-placer-bld20-06712-6021
Who To Contact
No source-supported contact information was found.
Next Action
Pull the permit packet and identify the applicant, owner, or listed contractor.
- + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
- + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
- + No source-supported contact is available; next step is source-record review rather than invented outreach.
Confidence Breakdown
Resolution confidence 95%Permit Evidence
86%1 permit record(s) support the opportunity.
Planning Evidence
0%Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.
Bid Evidence
0%No SAM.gov bid evidence attached.
Source Agreement
75%3 independent source family/families attached. Confidence increases when multiple sources agree.
Contacts
Developer
No contact information available
Builder
No contact information available
General Contractor
No contact information available
Architect
No contact information available
Engineer
No contact information available
Signals
Opportunity indicators detected before, during, and after permits.
| Signal | Date | Importance | Description | Source |
|---|---|---|---|---|
| Permit | Jul 5, 2026 | 89 | Placer County active permit BLD20-06712: MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000 | Placer County Active Building Permits |
Permits
Supporting records, searchable and sortable.
| BLD20-06712 | Single Family < 3000 | Jul 5, 2026 | Undisclosed | Issued |
Documents
| Title | Type | Date | Source |
|---|---|---|---|
| BLD20-06712 source record | Sacramento County permit source | Jul 5, 2026 | Open source |
Timeline
- Planning
- Proposed
- Approved
- Permitted
- Under Construction
- Completed
Evidence Panel
MASTER PLAN Placer Vineyards 1A - 2579 Plan #10
MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000
project - Placer County Active Building Permits - confidence 72%
BLD20-06712 Single Family < 3000
MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000
source_record - Placer County Active Building Permits - confidence 82%
Single Family < 3000 BLD20-06712
Issued permit dated 2026-07-05.
permit - Permit record - confidence 86%
Permit
Placer County active permit BLD20-06712: MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000
signal - Placer County Active Building Permits - confidence 89%
BLD20-06712 source record
MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 - R-3 / U VB MASTER PLAN Placer Vineyards 1A - 2579 Plan #10 Living: 2579 SQ Ft. 1-Car Garage: 200 SQ Ft 2-Car Garage: 421 SQ Ft Covered Porch: 26 SQ Ft. Covered Patio : 170 SQ. Ft. SPECIAL INSPECTION - SHEAR WALL QII INSULATION PV SYSTEM (8 PANELS) SPRINKLERS REQUIRED STRUCTURAL OBSERVATION IS REQUIRED ON ALL MODEL HOMES. (FOUNDATION, SHEAR AND ROUGH FRAME) START-UP OF PRODUCTION HOMES WILL REQUIRE THE FIRST TWO HOMES OF EACH PLAN TO HAVE STRUCTURAL OBSERVATIONS. PLAN CHECK COMPLETE - PFH 2/19/2021 ----------------------------------------------------------------------------------------------------------------------------------- ALTERNATIVE MANUFACTURER TRUSS CALCS 08/05/2021. -BH ------------------------------------------------------------------------------------------------------------------------------------ REV 2: REVISED PV SYSTEM SIZE/EQUIPMENT - 3/21/22 - MP SYSTEM A: 3.80 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G9 380 W/ (10) IQ7PLUS-72-2-US SYSTEM B: 4.0 KW DC: (10) HANWHA Q.PEAK DUO BLK ML-G10 400 W/ (10) IQ7PLUS-72-2-US - Single Family < 3000
document - Sacramento County permit source - confidence 76%