SAEED - SOLAR RM
Opportunity Score
81
Project Stage
Permitted
Timeline
0-6 months
Size / Value
Small / Undisclosed
Location
Placer County, Placer County
Primary Contact
No contact information available
Developer / Builder
No developer / No builder
Current Stage
Permitted
Updated Jul 5, 2026
Opportunity Analysis
Opportunity Score
81
Estimated timeline: 0-6 months
Reasoning
- + Project is still in a reachable stage: Permitted.
- + Commercial work may create HVAC, roofing, concrete, and buildout opportunities.
- + Permit activity suggests work may be approaching start.
- + No known general contractor is attached in public records.
Generated Opportunity
Generated from collected signals and supporting evidence.
Trade
Roofing
Horizon
Fast Money
Score
93
Estimated Opportunity Value
Not estimated
Start Window
0-6 months
Revenue Reasoning
Confidence 20%Not estimated
- + No permit valuation or project value was available in the supporting evidence.
Why This Trade
- + Roofing material or roof work appears directly in the source record. (90%)
Transparent Score Explanation
Base opportunity
+30A normalized public project record exists.
Evidence: ev-project-placer-bld21-02547-5985, placer-evidence-bld21-02547-5985
Near-term horizon
+20Timing evidence places this in the 0-6 month Fast Money window.
Evidence: ev-permit-placer-permit-bld21-02547-5985, ev-signal-placer-signal-bld21-02547-5985
Permit evidence
+15Permit records increase confidence that work is moving toward execution.
Evidence: ev-permit-placer-permit-bld21-02547-5985
Real source record
+10This recommendation is backed by a collected public source record, not only synthetic project data.
Evidence: placer-evidence-bld21-02547-5985
Trade fit
+8Roofing is supported by 1 source-backed trade signal(s).
Evidence: placer-evidence-bld21-02547-5985
Open contractor slot
+10No general contractor is attached in the available public evidence.
Evidence: ev-project-placer-bld21-02547-5985
Who To Contact
No source-supported contact information was found.
Next Action
Pull the permit packet and identify the applicant, owner, or listed contractor.
- + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
- + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
- + No source-supported contact is available; next step is source-record review rather than invented outreach.
Confidence Breakdown
Resolution confidence 95%Permit Evidence
86%1 permit record(s) support the opportunity.
Planning Evidence
0%Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.
Bid Evidence
0%No SAM.gov bid evidence attached.
Source Agreement
75%3 independent source family/families attached. Confidence increases when multiple sources agree.
Contacts
Developer
No contact information available
Builder
No contact information available
General Contractor
No contact information available
Architect
No contact information available
Engineer
No contact information available
Signals
Opportunity indicators detected before, during, and after permits.
| Signal | Date | Importance | Description | Source |
|---|---|---|---|---|
| Permit | Jul 5, 2026 | 89 | Placer County active permit BLD21-02547: SAEED - SOLAR RM - INSTALL LOCATION: PRIMARY DWELLING SYSTEM OUTPUT: 12.24 KW DC CURRENT MAIN AMPERAGE: 200A PANEL CHANGEOUT: NO PROPOSED AMPERAGE: 175A DERATED MAIN BREAKER (36) MODULES - HANWAHA Q. PEAK DUO BLK-G6+ (340 WATT) (1) 7.6 KW TESLA SOLAR INVERTER 153800-00-E (1) 3.8 KW TESLA SOLAR INVERTER 153400-00-E (N)(14) TESLA MID CIRCUIT INTERUPTER (690.11 AND 690.12 COMPLIANT) (N) 20A PV BREAKER @ MSP (N) 40A PV BREAKER @ MSP (N) 175A DERATED MAIN BREAKER @ MSP MOUNTING SYSTEM: ZEP ZS SPAN WITH FLAT TILE HOOK TRENCHING / GRADING: NO - Solar Roof Mount | Placer County Active Building Permits |
Permits
Supporting records, searchable and sortable.
| BLD21-02547 | Solar Roof Mount | Jul 5, 2026 | Undisclosed | Issued |
Documents
| Title | Type | Date | Source |
|---|---|---|---|
| BLD21-02547 source record | Sacramento County permit source | Jul 5, 2026 | Open source |
Timeline
- Planning
- Proposed
- Approved
- Permitted
- Under Construction
- Completed
Evidence Panel
SAEED - SOLAR RM
SAEED - SOLAR RM - INSTALL LOCATION: PRIMARY DWELLING SYSTEM OUTPUT: 12.24 KW DC CURRENT MAIN AMPERAGE: 200A PANEL CHANGEOUT: NO PROPOSED AMPERAGE: 175A DERATED MAIN BREAKER (36) MODULES - HANWAHA Q. PEAK DUO BLK-G6+ (340 WATT) (1) 7.6 KW TESLA SOLAR INVERTER 153800-00-E (1) 3.8 KW TESLA SOLAR INVERTER 153400-00-E (N)(14) TESLA MID CIRCUIT INTERUPTER (690.11 AND 690.12 COMPLIANT) (N) 20A PV BREAKER @ MSP (N) 40A PV BREAKER @ MSP (N) 175A DERATED MAIN BREAKER @ MSP MOUNTING SYSTEM: ZEP ZS SPAN WITH FLAT TILE HOOK TRENCHING / GRADING: NO - Solar Roof Mount
project - Placer County Active Building Permits - confidence 72%
BLD21-02547 Solar Roof Mount
SAEED - SOLAR RM - INSTALL LOCATION: PRIMARY DWELLING SYSTEM OUTPUT: 12.24 KW DC CURRENT MAIN AMPERAGE: 200A PANEL CHANGEOUT: NO PROPOSED AMPERAGE: 175A DERATED MAIN BREAKER (36) MODULES - HANWAHA Q. PEAK DUO BLK-G6+ (340 WATT) (1) 7.6 KW TESLA SOLAR INVERTER 153800-00-E (1) 3.8 KW TESLA SOLAR INVERTER 153400-00-E (N)(14) TESLA MID CIRCUIT INTERUPTER (690.11 AND 690.12 COMPLIANT) (N) 20A PV BREAKER @ MSP (N) 40A PV BREAKER @ MSP (N) 175A DERATED MAIN BREAKER @ MSP MOUNTING SYSTEM: ZEP ZS SPAN WITH FLAT TILE HOOK TRENCHING / GRADING: NO - Solar Roof Mount
source_record - Placer County Active Building Permits - confidence 82%
Solar Roof Mount BLD21-02547
Issued permit dated 2026-07-05.
permit - Permit record - confidence 86%
Permit
Placer County active permit BLD21-02547: SAEED - SOLAR RM - INSTALL LOCATION: PRIMARY DWELLING SYSTEM OUTPUT: 12.24 KW DC CURRENT MAIN AMPERAGE: 200A PANEL CHANGEOUT: NO PROPOSED AMPERAGE: 175A DERATED MAIN BREAKER (36) MODULES - HANWAHA Q. PEAK DUO BLK-G6+ (340 WATT) (1) 7.6 KW TESLA SOLAR INVERTER 153800-00-E (1) 3.8 KW TESLA SOLAR INVERTER 153400-00-E (N)(14) TESLA MID CIRCUIT INTERUPTER (690.11 AND 690.12 COMPLIANT) (N) 20A PV BREAKER @ MSP (N) 40A PV BREAKER @ MSP (N) 175A DERATED MAIN BREAKER @ MSP MOUNTING SYSTEM: ZEP ZS SPAN WITH FLAT TILE HOOK TRENCHING / GRADING: NO - Solar Roof Mount
signal - Placer County Active Building Permits - confidence 89%
BLD21-02547 source record
SAEED - SOLAR RM - INSTALL LOCATION: PRIMARY DWELLING SYSTEM OUTPUT: 12.24 KW DC CURRENT MAIN AMPERAGE: 200A PANEL CHANGEOUT: NO PROPOSED AMPERAGE: 175A DERATED MAIN BREAKER (36) MODULES - HANWAHA Q. PEAK DUO BLK-G6+ (340 WATT) (1) 7.6 KW TESLA SOLAR INVERTER 153800-00-E (1) 3.8 KW TESLA SOLAR INVERTER 153400-00-E (N)(14) TESLA MID CIRCUIT INTERUPTER (690.11 AND 690.12 COMPLIANT) (N) 20A PV BREAKER @ MSP (N) 40A PV BREAKER @ MSP (N) 175A DERATED MAIN BREAKER @ MSP MOUNTING SYSTEM: ZEP ZS SPAN WITH FLAT TILE HOOK TRENCHING / GRADING: NO - Solar Roof Mount
document - Sacramento County permit source - confidence 76%