Hopkins Village - Lot 29 ***DIGITAL REVIEW***
Opportunity Score
73
Project Stage
Permitted
Timeline
0-6 months
Size / Value
Small / Undisclosed
Location
Placer County, Placer County
Primary Contact
No contact information available
Developer / Builder
No developer / No builder
Current Stage
Permitted
Updated Jul 5, 2026
Contractor-facing opportunity
No source-backed phone or email yet; access route research may still make this usable. · 5 evidence record(s) attached · Location is present · Project identity is present · Some access intelligence exists, but the contractor entry path is incomplete.
Fast Money Score
94
Contact Confidence
0%
Resolution Confidence
95%
Recommended Action
Research a direct phone for Unknown decision maker before calling about Hopkins Village - Lot 29 ***DIGITAL REVIEW***.
Actionability
26
Contractor Score
75
Likely Scope
Residential perimeter fencing
Access Path
Unknown
Subcontractor Likelihood
High
Project Stage
Open
What To Say
Hi, this is [Name] with Twin Rivers. I'm calling about Hopkins Village - Lot 29 ***DIGITAL REVIEW***. Who handles fence/gate subcontractor pricing for your project team?
Additional intelligence not yet discovered: developer, general contractor, phone, access path.
Scope Intelligence
Hopkins Village - Lot 29 ***DIGITAL REVIEW*** - Third party APEX review New pre-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Dec…
Fence Scope
No Evidence
Fence Signal Score
0
Potential Scope
Unknown
Why Fencing Is Relevant
Primary scope is Solar / electrical. Incidental gate or fence mentions are not indicative of a bidable fencing opportunity.
- + Subdivision or community development evidence
No Evidence: 0 strong fence evidence signal(s), 0 weak signal(s), 1 total signal(s), 2 limiting signal(s), categories Housing, Utilities, Public Works, primary scope Solar / electrical, and only permit/opportunity metadata is available. Not bidable: Primary scope is Solar / electrical; no fencing evidence found.
Project Dossier
Document-extracted project intelligence. Evidence from source documents is preferred over permit metadata assumptions.
What Is Being Built
Electrical
Procurement Path
GC Relationship
Scope Summary
Electrical
Identified Quantities
- 1936 sf — e-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf U
- 256 sf — garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered D
- 116 sf — ---------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified
- 21 sf — --------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit requ
- 1936 sf — re-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf
- 256 sf — d garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered
- 116 sf — -----------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verifi
- 21 sf — ----------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit re
Timeline
No bid or construction dates extracted from available documents yet.
Supporting Evidence
“lar System Special Inspection Required Structural Observation Required 617 Bear Bin 622 CWM Plan - Duplex Fencing score 75: Large scope, high subcontractor likelihood, high opportunity size, open stage. Concrete, Ele”
Source: Opportunity / permit record
Open source“e-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf C”
Source: Opportunity / permit record
Open source“garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verifie”
Source: Opportunity / permit record
Open source“score 75: Large scope, high subcontractor likelihood, high opportunity size, open stage. Concrete, Electrical, Fencing Unknown Unknown”
Source: Opportunity / permit record
Open source
Reviewed 3 source document(s). 0 remotely fetched. 1 scope item(s), 8 quantity signal(s), 1 trade evidence quote(s).
Project Dossier
Hopkins Village - Lot 29 ***DIGITAL REVIEW*** - Third party APEX review New pre-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit required for PV Solar System Special Inspection Required Structural Observation Required 617 Bear Bin 622 CWM Plan - Duplex
Developer
Unknown
Applicant
Unknown
Primary Objective
Enable future residential construction.
Associated Improvements
- + Utility work
- + Residential development infrastructure
Work Categories
- + Utility work
- + Residential development infrastructure
Related Development
Related residential development identified
Why Fencing Is Relevant
Primary scope is Solar / electrical; no fencing evidence found.
No Evidence: 2 related evidence record(s), 0 positive evidence signal(s), and 1 negative evidence signal(s).
Best Available Contact
Highest-ranked source-backed route for reaching a human before falling back to procurement access.
Additional contact intelligence not yet discovered. Use the known access route or continue research before direct outreach.
Opportunity Analysis
Opportunity Score
73
Estimated timeline: 0-6 months
Fast Money score: 94
Reasoning
- + Project is still in a reachable stage: Permitted.
- + Permit activity suggests work may be approaching start.
- + No known general contractor is attached in public records.
Estimated Contractor Categories
Evidence
Generated Opportunity
Generated from collected signals and supporting evidence.
Trade
Electrical
Horizon
Fast Money
Score
93
Estimated Opportunity Value
Not estimated
Payment Potential
3-6 months
Revenue Reasoning
Confidence 20%Not estimated
- + No permit valuation or project value was available in the supporting evidence.
Why This Trade
- + Solar, PV, or battery scope requires electrical work. (88%)
Transparent Score Explanation
Base opportunity
+30A normalized public project record exists.
Evidence: ev-project-placer-bld21-02807-6058, placer-evidence-bld21-02807-6058
Near-term horizon
+20Timing evidence places this in the 0-6 month Fast Money window.
Evidence: ev-permit-placer-permit-bld21-02807-6058, ev-signal-placer-signal-bld21-02807-6058
Permit evidence
+15Permit records increase confidence that work is moving toward execution.
Evidence: ev-permit-placer-permit-bld21-02807-6058
Real source record
+10This recommendation is backed by a collected public source record, not only synthetic project data.
Evidence: placer-evidence-bld21-02807-6058
Trade fit
+8Electrical is supported by 1 source-backed trade signal(s).
Evidence: placer-evidence-bld21-02807-6058
Open contractor slot
+10No general contractor is attached in the available public evidence.
Evidence: ev-project-placer-bld21-02807-6058
Who To Contact
No source-supported contact information was found.
Next Action
Pull the permit packet and identify the applicant, owner, or listed contractor.
- + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
- + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
- + No source-supported contact is available; next step is source-record review rather than invented outreach.
Confidence Breakdown
Resolution confidence 95%Permit Evidence
86%1 permit record(s) support the opportunity.
Planning Evidence
0%Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.
Bid Evidence
0%No SAM.gov bid evidence attached.
Source Agreement
75%3 independent source family/families attached. Confidence increases when multiple sources agree.
Contacts
Developer
No contact information available
Builder
No contact information available
General Contractor
No contact information available
Architect
No contact information available
Engineer
No contact information available
Signals
Opportunity indicators detected before, during, and after permits.
| Signal | Date | Importance | Description | Source |
|---|---|---|---|---|
| Permit | Jul 5, 2026 | 89 | Placer County active permit BLD21-02807: Hopkins Village - Lot 29 ***DIGITAL REVIEW*** - Third party APEX review New pre-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit required for PV Solar System Special Inspection Required Structural Observation Required 617 Bear Bin 622 CWM Plan - Duplex | Placer County Active Building Permits |
Permits
Supporting records, searchable and sortable.
| BLD21-02807 | Duplex | Jul 5, 2026 | Undisclosed | Issued |
Documents
| Title | Type | Date | Source |
|---|---|---|---|
| BLD21-02807 source record | Sacramento County permit source | Jul 5, 2026 | Open source |
Timeline
- Planning
- Proposed
- Approved
- Permitted
- Under Construction
- Completed
Evidence Panel
Hopkins Village - Lot 29 ***DIGITAL REVIEW***
Hopkins Village - Lot 29 ***DIGITAL REVIEW*** - Third party APEX review New pre-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit required for PV Solar System Special Inspection Required Structural Observation Required 617 Bear Bin 622 CWM Plan - Duplex
project - Placer County Active Building Permits - confidence 72%
BLD21-02807 Duplex
Hopkins Village - Lot 29 ***DIGITAL REVIEW*** - Third party APEX review New pre-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit required for PV Solar System Special Inspection Required Structural Observation Required 617 Bear Bin 622 CWM Plan - Duplex
source_record - Placer County Active Building Permits - confidence 82%
Duplex BLD21-02807
Issued permit dated 2026-07-05.
permit - Permit record - confidence 86%
Permit
Placer County active permit BLD21-02807: Hopkins Village - Lot 29 ***DIGITAL REVIEW*** - Third party APEX review New pre-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit required for PV Solar System Special Inspection Required Structural Observation Required 617 Bear Bin 622 CWM Plan - Duplex
signal - Placer County Active Building Permits - confidence 89%
BLD21-02807 source record
Hopkins Village - Lot 29 ***DIGITAL REVIEW*** - Third party APEX review New pre-fabricated residential home with attached garage. Living space-------------------------1936 sf Garage/storage---------------------256 sf Uncovered Decks/Porches------116 sf Covered Decks/Porches----------21 sf Verified by Apex 08/04/21 Separate permit required for PV Solar System Special Inspection Required Structural Observation Required 617 Bear Bin 622 CWM Plan - Duplex
document - Sacramento County permit source - confidence 76%