ResidentialGALTSacramento County

AREA: R10: Installation of accessory structure

Opportunity Score

56

Project Stage

Planning

Timeline

6-18 months

Size / Value

Small / $99,300

Location

GALT, Sacramento County

Primary Contact

AMERICAN CARPORTS INC

Developer / Builder

No developer / No builder

Current Stage

Planning

Updated Jul 5, 2026

Opportunity Analysis

Opportunity Score

56

Estimated timeline: 6-18 months

Reasoning

  • + Project is still in a reachable stage: Planning.
  • + Infrastructure or utility activity can create site work, fencing, concrete, and electrical demand.

Estimated Contractor Categories

FencingConcreteLandscapingRoofing

Evidence

Caveats

  • - A contractor is already identified in public records.

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Fencing

Horizon

Pipeline

Score

79

Estimated Opportunity Value

Under $25k

Start Window

6-18 months

Revenue Reasoning

Confidence 78%

$1,490 - $4,469

  • + Based on permit valuation from source record.
  • + Fencing matched source text or project characteristics.
  • + Residential project type affects expected trade share.

Why This Trade

  • + Fencing was selected from source-record trade inference. (60%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-sac-cbnr2026-00558, sac-evidence-cbnr2026-00558

Pipeline horizon

+12

Planning or approval evidence places this in the 6-18 month pipeline.

Evidence: ev-signal-sac-signal-cbnr2026-00558

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-sac-permit-cbnr2026-00558

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: sac-evidence-cbnr2026-00558

Planning evidence

+12

Planning, land, parcel, CEQA, or utility records support the recommendation.

Evidence: ev-signal-sac-signal-cbnr2026-00558

Trade fit

+8

Fencing is supported by 1 source-backed trade signal(s).

Evidence: sac-evidence-cbnr2026-00558

Known contractor

-8

A contractor is already named, so outreach should verify whether this scope remains open.

Evidence: ev-project-sac-cbnr2026-00558

Who To Contact

CompanyContactPhoneEmailWebsiteRoleConfidenceSource
AMERICAN CARPORTS INCNot listedNot listedNot listedNot listedGeneral Contractor62%Contractor listed on Sacramento County permit CBNR2026-00558.
AMERICAN CARPORTS INCNot listedNot listedNot listedNot listedGeneral Contractor74%Sacramento County Permits

Next Action

Save the opportunity, monitor permit conversion, and contact the developer before bid packages close.

  • + Pipeline horizon was selected from project stage Planning and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + At least one source-supported contact is available.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

0%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: AMERICAN CARPORTS INC

Developer

No contact information available

Builder

No contact information available

General Contractor

AMERICAN CARPORTS INC

Contractor - General Contractor

No contact information available

No contact information available

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
Utility ExpansionJun 26, 202665Utility Expansion from Sacramento County permit CBNR2026-00558: AREA: R10: Installation of accessory structure - Installation of a 1500 sq ft metal accessory structure with 2sides, 2ends, being installed on a concrete slab. - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry WallSacramento County Permits

Permits

Supporting records, searchable and sortable.

CBNR2026-00558ResidentialJun 26, 2026$99,300In Plan Review

Documents

TitleTypeDateSource
CBNR2026-00558 source recordSacramento County permit sourceJul 5, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

AREA: R10: Installation of accessory structure

AREA: R10: Installation of accessory structure - Installation of a 1500 sq ft metal accessory structure with 2sides, 2ends, being installed on a concrete slab. - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

project - Sacramento County Permits - confidence 72%

Open source

CBNR2026-00558 Residential

AREA: R10: Installation of accessory structure - Installation of a 1500 sq ft metal accessory structure with 2sides, 2ends, being installed on a concrete slab. - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

source_record - Sacramento County Permits - confidence 90%

Open source

Residential CBNR2026-00558

In Plan Review permit dated 2026-06-26.

permit - Permit record - confidence 86%

Open source

Utility Expansion

Utility Expansion from Sacramento County permit CBNR2026-00558: AREA: R10: Installation of accessory structure - Installation of a 1500 sq ft metal accessory structure with 2sides, 2ends, being installed on a concrete slab. - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

signal - Sacramento County Permits - confidence 65%

Open source

CBNR2026-00558 source record

AREA: R10: Installation of accessory structure - Installation of a 1500 sq ft metal accessory structure with 2sides, 2ends, being installed on a concrete slab. - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

document - Sacramento County permit source - confidence 76%

Open source

Map