ResidentialSACRAMENTOSacramento County

AREA: R07: Extension of house, update roof geometry, new siding, remod

Opportunity Score

74

Project Stage

Planning

Timeline

6-18 months

Size / Value

Small / $80,000

Location

SACRAMENTO, Sacramento County

Primary Contact

No contact information available

Developer / Builder

No developer / No builder

Current Stage

Planning

Updated Jul 9, 2026

Contractor-facing opportunity

No source-backed phone or email yet; access route research may still make this usable. · 5 evidence record(s) attached · Location is present · Project identity is present · Some access intelligence exists, but the contractor entry path is incomplete.

Fast Money Score

45

Contact Confidence

0%

Resolution Confidence

95%

Recommended Action

Research a direct phone for Unknown decision maker before calling about AREA: R07: Extension of house, update roof geometry, new siding, remod.

Actionability

26

Contractor Score

43

Likely Scope

Residential perimeter fencing

Access Path

Unknown

Subcontractor Likelihood

Low

Project Stage

Unknown

What To Say

Hi, this is [Name] with Twin Rivers. I'm calling about AREA: R07: Extension of house, update roof geometry, new siding, remod. Who handles fence/gate subcontractor pricing for your project team?

Additional intelligence not yet discovered: developer, general contractor, phone, access path.

Scope Intelligence

AREA: R07: Extension of house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

UtilitiesPublic Works

Fence Scope

No Evidence

Fence Signal Score

0

Potential Scope

Unknown

Why Fencing Is Relevant

Primary scope is Solar / electrical. Incidental gate or fence mentions are not indicative of a bidable fencing opportunity.

No Evidence: 0 strong fence evidence signal(s), 0 weak signal(s), 0 total signal(s), 4 limiting signal(s), categories Utilities, Public Works, primary scope Solar / electrical, and only permit/opportunity metadata is available. Not bidable: Primary scope is Solar / electrical; no fencing evidence found.

Project Dossier

Document-extracted project intelligence. Evidence from source documents is preferred over permit metadata assumptions.

What Is Being Built

Re-roof, Electrical, Plumbing

Procurement Path

GC Relationship

Scope Summary

Re-roof; Electrical; Plumbing

Timeline

No bid or construction dates extracted from available documents yet.

Supporting Evidence

  • g, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall Fencing score 43: Small scope, unknown subcontractor likelihood, low opportunity size, unknown stage. Electric

    Source: Opportunity / permit record

    Open source
  • f house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Ga

    Source: Opportunity / permit record

    Open source

Reviewed 3 source document(s). 0 remotely fetched. 3 scope item(s), 0 quantity signal(s), 1 trade evidence quote(s).

Project Dossier

AREA: R07: Extension of house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

Developer

Unknown

Applicant

Unknown

Primary Objective

Work indicated: Utility work, Residential development infrastructure, Roofing. Primary scope: Solar / electrical. Source: permit or opportunity record.

Associated Improvements

  • + Utility work
  • + Residential development infrastructure
  • + Roofing

Work Categories

  • + Utility work
  • + Residential development infrastructure
  • + Roofing

Related Development

Related residential development identified

Why Fencing Is Relevant

Primary scope is Solar / electrical; no fencing evidence found.

No Evidence: 2 related evidence record(s), 0 positive evidence signal(s), and 2 negative evidence signal(s).

Best Available Contact

Highest-ranked source-backed route for reaching a human before falling back to procurement access.

Additional contact intelligence not yet discovered. Use the known access route or continue research before direct outreach.

Opportunity Analysis

Opportunity Score

74

Estimated timeline: 6-18 months

Fast Money score: 45

Reasoning

  • + Project is still in a reachable stage: Planning.
  • + Infrastructure or utility activity can create site work, fencing, concrete, and electrical demand.
  • + No known general contractor is attached in public records.

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Fencing

Horizon

Pipeline

Score

97

Estimated Opportunity Value

Under $25k

Payment Potential

12+ months

Revenue Reasoning

Confidence 78%

$1,200 - $3,600

  • + Based on permit valuation from source record.
  • + Fencing matched source text or project characteristics.
  • + Residential project type affects expected trade share.

Why This Trade

  • + Fencing was selected from source-record trade inference. (60%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-sac-cbnr2026-00582, sac-evidence-cbnr2026-00582

Pipeline horizon

+12

Planning or approval evidence places this in the 6-18 month pipeline.

Evidence: ev-signal-sac-signal-cbnr2026-00582

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-sac-permit-cbnr2026-00582

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: sac-evidence-cbnr2026-00582

Planning evidence

+12

Planning, land, parcel, CEQA, or utility records support the recommendation.

Evidence: ev-signal-sac-signal-cbnr2026-00582

Trade fit

+8

Fencing is supported by 1 source-backed trade signal(s).

Evidence: sac-evidence-cbnr2026-00582

Open contractor slot

+10

No general contractor is attached in the available public evidence.

Evidence: ev-project-sac-cbnr2026-00582

Who To Contact

No source-supported contact information was found.

Next Action

Save the opportunity, monitor permit conversion, and contact the developer before bid packages close.

  • + Pipeline horizon was selected from project stage Planning and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + No source-supported contact is available; next step is source-record review rather than invented outreach.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

0%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: No contact information available

Developer

No contact information available

Builder

No contact information available

General Contractor

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
Utility ExpansionJul 6, 202665Utility Expansion from Sacramento County permit CBNR2026-00582: AREA: R07: Extension of house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry WallSacramento County Permits

Permits

Supporting records, searchable and sortable.

CBNR2026-00582ResidentialJul 6, 2026$80,000Application Received

Documents

TitleTypeDateSource
CBNR2026-00582 source recordSacramento County permit sourceJul 9, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

AREA: R07: Extension of house, update roof geometry, new siding, remod

AREA: R07: Extension of house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

project - Sacramento County Permits - confidence 72%

Open source

CBNR2026-00582 Residential

AREA: R07: Extension of house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

source_record - Sacramento County Permits - confidence 90%

Open source

Residential CBNR2026-00582

Application Received permit dated 2026-07-06.

permit - Permit record - confidence 86%

Open source

Utility Expansion

Utility Expansion from Sacramento County permit CBNR2026-00582: AREA: R07: Extension of house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

signal - Sacramento County Permits - confidence 65%

Open source

CBNR2026-00582 source record

AREA: R07: Extension of house, update roof geometry, new siding, remod - Square footage addition, siding, new roof style, electrical, plumbing, - New Building, Addition, ADU (not a garage conversion), Deck, Patio Cover, Garage, Barn, Ground Mount Solar, Masonry Wall

document - Sacramento County permit source - confidence 76%

Open source

Map