ResidentialLOT# 276Sacramento County

SOLAR : AREA: R07: Florin Vineyards I & II - Village 2 - Plan 45-09A LOT 276

Opportunity Score

32

Project Stage

Completed

Timeline

Completed

Size / Value

Small / $558,998

Location

LOT# 276, Sacramento County

Primary Contact

No contact information available

Developer / Builder

No developer / No builder

Current Stage

Completed

Updated Jul 5, 2026

Opportunity Analysis

Opportunity Score

32

Estimated timeline: Completed

Reasoning

  • + Early planning signals suggest contractor selection may still be open.
  • + No known general contractor is attached in public records.

Estimated Contractor Categories

FencingConcreteLandscapingRoofing

Evidence

Caveats

  • - Project appears completed, reducing new-work opportunity.

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Electrical

Horizon

Pipeline

Score

42

Estimated Opportunity Value

$75k-$250k

Start Window

6-18 months

Revenue Reasoning

Confidence 78%

$27,950 - $89,440

  • + Based on permit valuation from source record.
  • + Electrical matched source text or project characteristics.
  • + Residential project type affects expected trade share.

Why This Trade

  • + Solar, PV, or battery scope requires electrical work. (88%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-sac-phcr2026-00565, sac-evidence-phcr2026-00565

Pipeline horizon

+12

Planning or approval evidence places this in the 6-18 month pipeline.

Evidence: ev-signal-sac-signal-phcr2026-00565

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-sac-permit-phcr2026-00565

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: sac-evidence-phcr2026-00565

Planning evidence

+12

Planning, land, parcel, CEQA, or utility records support the recommendation.

Evidence: ev-signal-sac-signal-phcr2026-00565

Trade fit

+8

Electrical is supported by 1 source-backed trade signal(s).

Evidence: sac-evidence-phcr2026-00565

Open contractor slot

+10

No general contractor is attached in the available public evidence.

Evidence: ev-project-sac-phcr2026-00565

Completed project

-35

Completed status substantially reduces new-work potential.

Evidence: ev-project-sac-phcr2026-00565

False-positive control

-20

Collected source indicates completed work; only pursue if a related follow-on scope exists.

Evidence: sac-evidence-phcr2026-00565

Who To Contact

No source-supported contact information was found.

Next Action

Save the opportunity, monitor permit conversion, and contact the developer before bid packages close.

  • + Pipeline horizon was selected from project stage Completed and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + No source-supported contact is available; next step is source-record review rather than invented outreach.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

76%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: No contact information available

Developer

No contact information available

Builder

No contact information available

General Contractor

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
Subdivision FilingJul 2, 202697Subdivision Filing from Sacramento County permit PHCR2026-00565: SOLAR : AREA: R07: Florin Vineyards I & II - Village 2 - Plan 45-09A LOT 276 - PRODUCTION HOME - (3006) S.F. SFD, (2) STORY, (5) BEDROOM, (4) BATH, (457) S.F. ATTACHED GARAGE, (149) S.F. PORCH/ (215) S.F. OPTION PATIO Solar PV System [45-09A], Option [B], KWDC [4.84], Panels [11]. Master Plan Number: MPCR2025-00032 - Residential/Single-Family/Duplex - Production HousingSacramento County Permits

Permits

Supporting records, searchable and sortable.

PHCR2026-00565ResidentialJul 2, 2026$558,998Submittal Incomplete

Documents

TitleTypeDateSource
PHCR2026-00565 source recordSacramento County permit sourceJul 5, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

SOLAR : AREA: R07: Florin Vineyards I & II - Village 2 - Plan 45-09A LOT 276

SOLAR : AREA: R07: Florin Vineyards I & II - Village 2 - Plan 45-09A LOT 276 - PRODUCTION HOME - (3006) S.F. SFD, (2) STORY, (5) BEDROOM, (4) BATH, (457) S.F. ATTACHED GARAGE, (149) S.F. PORCH/ (215) S.F. OPTION PATIO Solar PV System [45-09A], Option [B], KWDC [4.84], Panels [11]. Master Plan Number: MPCR2025-00032 - Residential/Single-Family/Duplex - Production Housing

project - Sacramento County Permits - confidence 72%

Open source

PHCR2026-00565 Residential

SOLAR : AREA: R07: Florin Vineyards I & II - Village 2 - Plan 45-09A LOT 276 - PRODUCTION HOME - (3006) S.F. SFD, (2) STORY, (5) BEDROOM, (4) BATH, (457) S.F. ATTACHED GARAGE, (149) S.F. PORCH/ (215) S.F. OPTION PATIO Solar PV System [45-09A], Option [B], KWDC [4.84], Panels [11]. Master Plan Number: MPCR2025-00032 - Residential/Single-Family/Duplex - Production Housing

source_record - Sacramento County Permits - confidence 90%

Open source

Residential PHCR2026-00565

Submittal Incomplete permit dated 2026-07-02.

permit - Permit record - confidence 86%

Open source

Subdivision Filing

Subdivision Filing from Sacramento County permit PHCR2026-00565: SOLAR : AREA: R07: Florin Vineyards I & II - Village 2 - Plan 45-09A LOT 276 - PRODUCTION HOME - (3006) S.F. SFD, (2) STORY, (5) BEDROOM, (4) BATH, (457) S.F. ATTACHED GARAGE, (149) S.F. PORCH/ (215) S.F. OPTION PATIO Solar PV System [45-09A], Option [B], KWDC [4.84], Panels [11]. Master Plan Number: MPCR2025-00032 - Residential/Single-Family/Duplex - Production Housing

signal - Sacramento County Permits - confidence 97%

Open source

PHCR2026-00565 source record

SOLAR : AREA: R07: Florin Vineyards I & II - Village 2 - Plan 45-09A LOT 276 - PRODUCTION HOME - (3006) S.F. SFD, (2) STORY, (5) BEDROOM, (4) BATH, (457) S.F. ATTACHED GARAGE, (149) S.F. PORCH/ (215) S.F. OPTION PATIO Solar PV System [45-09A], Option [B], KWDC [4.84], Panels [11]. Master Plan Number: MPCR2025-00032 - Residential/Single-Family/Duplex - Production Housing

document - Sacramento County permit source - confidence 76%

Open source

Map