ResidentialSACRAMENTOSacramento County

AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17

Opportunity Score

60

Project Stage

Planning

Timeline

6-18 months

Size / Value

Small / $643,215

Location

SACRAMENTO, Sacramento County

Primary Contact

LENNAR HOMES OF CALIFORNIA LLC

Developer / Builder

No developer / No builder

Current Stage

Planning

Updated Jul 9, 2026

Contractor-facing opportunity

No source-backed phone or email yet; access route research may still make this usable. · 5 evidence record(s) attached · Location is present · Project identity is present · Some access intelligence exists, but the contractor entry path is incomplete.

Fast Money Score

45

Contact Confidence

0%

Resolution Confidence

95%

Recommended Action

Call Lennar Sacramento Division (Lennar Homes of California) at (916) 746-8515 tomorrow morning and ask for estimating/purchasing regarding the fence/gate package on AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17.

Actionability

80

Contractor Score

78

Likely Scope

Residential perimeter fencing

Access Path

Developer-driven

Subcontractor Likelihood

High

Project Stage

Open

What To Say

Hi, this is [Name] with Twin Rivers. I'm calling about AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17. Who handles fence/gate subcontractor pricing for Lennar Homes of California?

Additional intelligence not yet discovered: general contractor.

Scope Intelligence

AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17 - PRODUCTION HOME - (3427) S.F. SFD, (2) STORY, (5) BEDROOM, (3.5) BATH, (682) S.F. ATTACHED GARAGE, (62) S.F. PORCH, (66)S.F. NEXT GEN. PRIVATE ENTRY PORCH, (240) S.F. OPTIONAL COVERED PATIO, Solar PV Syste…

HousingUtilitiesPublic WorksEnvironmentalDrainage

Fence Scope

No Evidence

Fence Signal Score

0

Potential Scope

Unknown

Why Fencing Is Relevant

Primary scope is Solar / electrical. Incidental gate or fence mentions are not indicative of a bidable fencing opportunity.

  • + Subdivision or community development evidence

No Evidence: 0 strong fence evidence signal(s), 0 weak signal(s), 1 total signal(s), 3 limiting signal(s), categories Housing, Utilities, Public Works, Environmental, Drainage, primary scope Solar / electrical, and only permit/opportunity metadata is available. Not bidable: Primary scope is Solar / electrical; no fencing evidence found.

Project Dossier

Document-extracted project intelligence. Evidence from source documents is preferred over permit metadata assumptions.

What Is Being Built

Foundation, Flatwork, Driveway

Procurement Path

GC Relationship

Scope Summary

Foundation; Flatwork; Driveway; Retaining wall; Electrical

Timeline

No bid or construction dates extracted from available documents yet.

Best Contact

Lennar Homes of California · Developer

Source: Opportunity record

Supporting Evidence

  • Issued by the Executive Officer on 28 August 2025 Pacific Gas and Electric Company, Rock Slough Fish Screen Fence Move Project WDID 5B07CR00213, Notice of Applicability Water Quality Certification, Issued by the Exec

    Source: Central Valley Regional Water Quality Control Board: 401 Water Quality Certifications - Lennar Gerber Creek

    Open source
  • .74], Panels [14]. Master Plan Number: MPCR2025-00059 - Residential/Single-Family/Duplex - Production Housing Fencing score 78: Large scope, high subcontractor likelihood, high opportunity size, open stage. Electrical, F

    Source: Opportunity / permit record

    Open source
  • ater Quality Certification, Issued by the Executive Officer on 22 August 2022 RTR Investments, Inc., Jackson Gate North Project WDID 5B03CR00084, Water Quality Certification, Issued by the Executive Officer on 5 Septem

    Source: Central Valley Regional Water Quality Control Board: 401 Water Quality Certifications - Lennar Gerber Creek

    Open source
  • lity Certification, Issued by the Executive Officer on 14 July 2023 Riggs, Rodney; Riggs Residence Foundation Repair Project WDID 5B05CR00077, Water Quality Certification, Issued by the Executive Of

    Source: Central Valley Regional Water Quality Control Board: 401 Water Quality Certifications - Lennar Gerber Creek

    Open source

Reviewed 5 source document(s). 2 remotely fetched. 10 scope item(s), 0 quantity signal(s), 4 trade evidence quote(s).

Project Dossier

AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17 - PRODUCTION HOME - (3427) S.F. SFD, (2) STORY, (5) BEDROOM, (3.5) BATH, (682) S.F. ATTACHED GARAGE, (62) S.F. PORCH, (66)S.F. NEXT GEN. PRIVATE ENTRY PORCH, (240) S.F. OPTIONAL COVERED PATIO, Solar PV System [3427], Option [3], KWDC [5.74], Panels [14]. Master Plan Number: MPCR2025-00059 - Residential/Single-Family/Duplex - Production Housing

Developer

Lennar Homes of California

Applicant

Lennar Homes of California

Primary Objective

Enable drainage, utility, or site infrastructure improvements.

Associated Improvements

  • + Drainage improvements
  • + Utility work
  • + Residential development infrastructure
  • + Utilities
  • + Drainage
  • + Parks / trails
  • + Site development

Work Categories

  • + Drainage improvements
  • + Utility work
  • + Residential development infrastructure

Related Development

Related residential development identified

Why Fencing Is Relevant

Primary scope is Solar / electrical; no fencing evidence found.

No Evidence: 4 related evidence record(s), 0 positive evidence signal(s), and 4 negative evidence signal(s).

Best Available Contact

Highest-ranked source-backed route for reaching a human before falling back to procurement access.

Contact

Lennar Sacramento Division, Regional Office - (916) 746-8515

Company

Lennar Homes of California

Contact Type

Regional

Confidence

85%

(916) 746-8515Source

Call Lennar Sacramento Division at (916) 746-8515 about AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17; if they are not the right desk, ask for purchasing, estimating, or subcontractor intake.

Evidence: Directory lists Lennar Homes in Roseville with office address and phone number.

Opportunity Analysis

Opportunity Score

60

Estimated timeline: 6-18 months

Fast Money score: 45

Reasoning

  • + Project is still in a reachable stage: Planning.
  • + Early planning signals suggest contractor selection may still be open.

Estimated Contractor Categories

ElectricalFencing

Evidence

Caveats

  • - A contractor is already identified in public records.

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Electrical

Horizon

Pipeline

Score

79

Estimated Opportunity Value

$75k-$250k

Payment Potential

12+ months

Revenue Reasoning

Confidence 78%

$32,161 - $102,914

  • + Based on permit valuation from source record.
  • + Electrical matched source text or project characteristics.
  • + Residential project type affects expected trade share.

Why This Trade

  • + Solar, PV, or battery scope requires electrical work. (88%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-sac-phcr2026-00574, sac-evidence-phcr2026-00574

Pipeline horizon

+12

Planning or approval evidence places this in the 6-18 month pipeline.

Evidence: ev-signal-sac-signal-phcr2026-00574

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-sac-permit-phcr2026-00574

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: sac-evidence-phcr2026-00574

Planning evidence

+12

Planning, land, parcel, CEQA, or utility records support the recommendation.

Evidence: ev-signal-sac-signal-phcr2026-00574

Trade fit

+8

Electrical is supported by 1 source-backed trade signal(s).

Evidence: sac-evidence-phcr2026-00574

Known contractor

-8

A contractor is already named, so outreach should verify whether this scope remains open.

Evidence: ev-project-sac-phcr2026-00574

Who To Contact

No source-supported contact information was found.

Next Action

Save the opportunity, monitor permit conversion, and contact the developer before bid packages close.

  • + Pipeline horizon was selected from project stage Planning and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + At least one source-supported contact is available.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

76%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: LENNAR HOMES OF CALIFORNIA LLC

Developer

No contact information available

Builder

No contact information available

General Contractor

LENNAR HOMES OF CALIFORNIA LLC

Contractor - General Contractor

No contact information available

No contact information available

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
Subdivision FilingJul 6, 202691Subdivision Filing from Sacramento County permit PHCR2026-00574: AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17 - PRODUCTION HOME - (3427) S.F. SFD, (2) STORY, (5) BEDROOM, (3.5) BATH, (682) S.F. ATTACHED GARAGE, (62) S.F. PORCH, (66)S.F. NEXT GEN. PRIVATE ENTRY PORCH, (240) S.F. OPTIONAL COVERED PATIO, Solar PV System [3427], Option [3], KWDC [5.74], Panels [14]. Master Plan Number: MPCR2025-00059 - Residential/Single-Family/Duplex - Production HousingSacramento County Permits

Permits

Supporting records, searchable and sortable.

PHCR2026-00574ResidentialJul 6, 2026$643,215Application Received

Documents

TitleTypeDateSource
PHCR2026-00574 source recordSacramento County permit sourceJul 9, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17

AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17 - PRODUCTION HOME - (3427) S.F. SFD, (2) STORY, (5) BEDROOM, (3.5) BATH, (682) S.F. ATTACHED GARAGE, (62) S.F. PORCH, (66)S.F. NEXT GEN. PRIVATE ENTRY PORCH, (240) S.F. OPTIONAL COVERED PATIO, Solar PV System [3427], Option [3], KWDC [5.74], Panels [14]. Master Plan Number: MPCR2025-00059 - Residential/Single-Family/Duplex - Production Housing

project - Sacramento County Permits - confidence 72%

Open source

PHCR2026-00574 Residential

AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17 - PRODUCTION HOME - (3427) S.F. SFD, (2) STORY, (5) BEDROOM, (3.5) BATH, (682) S.F. ATTACHED GARAGE, (62) S.F. PORCH, (66)S.F. NEXT GEN. PRIVATE ENTRY PORCH, (240) S.F. OPTIONAL COVERED PATIO, Solar PV System [3427], Option [3], KWDC [5.74], Panels [14]. Master Plan Number: MPCR2025-00059 - Residential/Single-Family/Duplex - Production Housing

source_record - Sacramento County Permits - confidence 90%

Open source

Residential PHCR2026-00574

Application Received permit dated 2026-07-06.

permit - Permit record - confidence 86%

Open source

Subdivision Filing

Subdivision Filing from Sacramento County permit PHCR2026-00574: AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17 - PRODUCTION HOME - (3427) S.F. SFD, (2) STORY, (5) BEDROOM, (3.5) BATH, (682) S.F. ATTACHED GARAGE, (62) S.F. PORCH, (66)S.F. NEXT GEN. PRIVATE ENTRY PORCH, (240) S.F. OPTIONAL COVERED PATIO, Solar PV System [3427], Option [3], KWDC [5.74], Panels [14]. Master Plan Number: MPCR2025-00059 - Residential/Single-Family/Duplex - Production Housing

signal - Sacramento County Permits - confidence 91%

Open source

PHCR2026-00574 source record

AREA: R07: VILLAGES AT ELDER CREEK-UNIT 2 - 3427 Elevation C - Lot 17 - PRODUCTION HOME - (3427) S.F. SFD, (2) STORY, (5) BEDROOM, (3.5) BATH, (682) S.F. ATTACHED GARAGE, (62) S.F. PORCH, (66)S.F. NEXT GEN. PRIVATE ENTRY PORCH, (240) S.F. OPTIONAL COVERED PATIO, Solar PV System [3427], Option [3], KWDC [5.74], Panels [14]. Master Plan Number: MPCR2025-00059 - Residential/Single-Family/Duplex - Production Housing

document - Sacramento County permit source - confidence 76%

Open source

Map