CommercialFAIR OAKSSacramento County

install TPO over existing capsheet

Opportunity Score

68

Project Stage

Planning

Timeline

6-18 months

Size / Value

Small / $82,476

Location

FAIR OAKS, Sacramento County

Primary Contact

ADVANCED ROOF DESIGN INC

Developer / Builder

No developer / No builder

Current Stage

Planning

Updated Jul 5, 2026

Opportunity Analysis

Opportunity Score

68

Estimated timeline: 6-18 months

Reasoning

  • + Project is still in a reachable stage: Planning.
  • + Commercial work may create HVAC, roofing, concrete, and buildout opportunities.
  • + Early planning signals suggest contractor selection may still be open.

Estimated Contractor Categories

HVACRoofingConcreteFencing

Evidence

Caveats

  • - A contractor is already identified in public records.

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Roofing

Horizon

Pipeline

Score

79

Estimated Opportunity Value

Under $25k

Start Window

6-18 months

Revenue Reasoning

Confidence 78%

$9,897 - $23,093

  • + Based on permit valuation from source record.
  • + Roofing matched source text or project characteristics.
  • + Commercial project type affects expected trade share.

Why This Trade

  • + Roofing material or roof work appears directly in the source record. (90%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-sac-rerc2026-00186, sac-evidence-rerc2026-00186

Pipeline horizon

+12

Planning or approval evidence places this in the 6-18 month pipeline.

Evidence: ev-signal-sac-signal-rerc2026-00186

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-sac-permit-rerc2026-00186

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: sac-evidence-rerc2026-00186

Planning evidence

+12

Planning, land, parcel, CEQA, or utility records support the recommendation.

Evidence: ev-signal-sac-signal-rerc2026-00186

Trade fit

+8

Roofing is supported by 1 source-backed trade signal(s).

Evidence: sac-evidence-rerc2026-00186

Known contractor

-8

A contractor is already named, so outreach should verify whether this scope remains open.

Evidence: ev-project-sac-rerc2026-00186

Who To Contact

CompanyContactPhoneEmailWebsiteRoleConfidenceSource
ADVANCED ROOF DESIGN INCNot listedNot listedNot listedNot listedGeneral Contractor62%Contractor listed on Sacramento County permit RERC2026-00186.
ADVANCED ROOF DESIGN INCNot listedNot listedNot listedNot listedGeneral Contractor74%Sacramento County Permits

Next Action

Save the opportunity, monitor permit conversion, and contact the developer before bid packages close.

  • + Pipeline horizon was selected from project stage Planning and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + At least one source-supported contact is available.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

76%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: ADVANCED ROOF DESIGN INC

Developer

No contact information available

Builder

No contact information available

General Contractor

ADVANCED ROOF DESIGN INC

Contractor - General Contractor

No contact information available

No contact information available

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
Planning ApplicationJul 3, 202665Planning Application from Sacramento County permit RERC2026-00186: install TPO over existing capsheet - 108, 131, or 132 inspection required prior to covering any work; Install 81 squares R-10 1.75" polyiso and GAF TPO membrane over existing capsheet - Re-Roof or OverlaySacramento County Permits

Permits

Supporting records, searchable and sortable.

RERC2026-00186CommercialJul 3, 2026$82,476Application Received

Documents

TitleTypeDateSource
RERC2026-00186 source recordSacramento County permit sourceJul 5, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

install TPO over existing capsheet

install TPO over existing capsheet - 108, 131, or 132 inspection required prior to covering any work; Install 81 squares R-10 1.75" polyiso and GAF TPO membrane over existing capsheet - Re-Roof or Overlay

project - Sacramento County Permits - confidence 72%

Open source

RERC2026-00186 Commercial

install TPO over existing capsheet - 108, 131, or 132 inspection required prior to covering any work; Install 81 squares R-10 1.75" polyiso and GAF TPO membrane over existing capsheet - Re-Roof or Overlay

source_record - Sacramento County Permits - confidence 90%

Open source

Commercial RERC2026-00186

Application Received permit dated 2026-07-03.

permit - Permit record - confidence 86%

Open source

Planning Application

Planning Application from Sacramento County permit RERC2026-00186: install TPO over existing capsheet - 108, 131, or 132 inspection required prior to covering any work; Install 81 squares R-10 1.75" polyiso and GAF TPO membrane over existing capsheet - Re-Roof or Overlay

signal - Sacramento County Permits - confidence 65%

Open source

RERC2026-00186 source record

install TPO over existing capsheet - 108, 131, or 132 inspection required prior to covering any work; Install 81 squares R-10 1.75" polyiso and GAF TPO membrane over existing capsheet - Re-Roof or Overlay

document - Sacramento County permit source - confidence 76%

Open source

Map