ResidentialANTELOPESacramento County

AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW

Opportunity Score

55

Project Stage

Permitted

Timeline

0-6 months

Size / Value

Small / $50,688

Location

ANTELOPE, Sacramento County

Primary Contact

GIGAWATT CALIFORNIA LLC

Developer / Builder

No developer / No builder

Current Stage

Permitted

Updated Jul 9, 2026

Contractor-facing opportunity

No source-backed phone or email yet; access route research may still make this usable. · 5 evidence record(s) attached · Location is present · Project identity is present · Some access intelligence exists, but the contractor entry path is incomplete.

Fast Money Score

94

Contact Confidence

0%

Resolution Confidence

95%

Recommended Action

Research a direct phone for GIGAWATT CALIFORNIA LLC before calling about AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW.

Actionability

52

Contractor Score

31

Likely Scope

Electrical scope

Access Path

GC-driven

Subcontractor Likelihood

Unknown

Project Stage

Unknown

What To Say

Hi, this is [Name] with Twin Rivers. I'm calling about AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW. Who handles fence/gate subcontractor pricing for GIGAWATT CALIFORNIA LLC?

Additional intelligence not yet discovered: developer, phone.

Scope Intelligence

AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors…

HousingUtilitiesPublic Works

Fence Scope

No Evidence

Fence Signal Score

0

Potential Scope

Unknown

Why Fencing Is Relevant

Primary scope is Solar / electrical. Incidental gate or fence mentions are not indicative of a bidable fencing opportunity.

  • + Subdivision or community development evidence

No Evidence: 0 strong fence evidence signal(s), 0 weak signal(s), 1 total signal(s), 2 limiting signal(s), categories Housing, Utilities, Public Works, primary scope Solar / electrical, and only permit/opportunity metadata is available. Not bidable: Primary scope is Solar / electrical; no fencing evidence found.

Project Dossier

Document-extracted project intelligence. Evidence from source documents is preferred over permit metadata assumptions.

What Is Being Built

Electrical

Procurement Path

GC Relationship

Scope Summary

Electrical

Timeline

No bid or construction dates extracted from available documents yet.

Best Contact

GIGAWATT CALIFORNIA LLC · General Contractor

Source: Opportunity record

Supporting Evidence

  • AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only) Electrical score 31: Small scope, unknown subcontractor likelihood, low opportunity size, unknown stage. Elect

    Source: Opportunity / permit record

    Open source
  • TOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH

    Source: Opportunity / permit record

    Open source
  • ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only) Electrical score

    Source: Opportunity / permit record

    Open source
  • SS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only) Electrical score 31: Small scope, unknown subcontractor likelihood, low opportunity size, unknown st

    Source: Opportunity / permit record

    Open source

Reviewed 3 source document(s). 0 remotely fetched. 1 scope item(s), 0 quantity signal(s), 4 trade evidence quote(s).

Project Dossier

AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)

Developer

Unknown

Applicant

Unknown

Primary Objective

Enable future residential construction.

Associated Improvements

  • + Utility work
  • + Residential development infrastructure

Work Categories

  • + Utility work
  • + Residential development infrastructure

Related Development

Related residential development identified

Why Fencing Is Relevant

Primary scope is Solar / electrical; no fencing evidence found.

No Evidence: 2 related evidence record(s), 0 positive evidence signal(s), and 1 negative evidence signal(s).

Best Available Contact

Highest-ranked source-backed route for reaching a human before falling back to procurement access.

Additional contact intelligence not yet discovered. Use the known access route or continue research before direct outreach.

Opportunity Analysis

Opportunity Score

55

Estimated timeline: 0-6 months

Fast Money score: 94

Reasoning

  • + Project is still in a reachable stage: Permitted.
  • + Permit activity suggests work may be approaching start.

Estimated Contractor Categories

Electrical

Evidence

Caveats

  • - A contractor is already identified in public records.

Generated Opportunity

Generated from collected signals and supporting evidence.

Trade

Electrical

Horizon

Fast Money

Score

75

Estimated Opportunity Value

Under $25k

Payment Potential

3-6 months

Revenue Reasoning

Confidence 78%

$2,534 - $8,110

  • + Based on permit valuation from source record.
  • + Electrical matched source text or project characteristics.
  • + Residential project type affects expected trade share.

Why This Trade

  • + Solar, PV, or battery scope requires electrical work. (88%)

Transparent Score Explanation

Base opportunity

+30

A normalized public project record exists.

Evidence: ev-project-sac-solr2026-00249, sac-evidence-solr2026-00249

Near-term horizon

+20

Timing evidence places this in the 0-6 month Fast Money window.

Evidence: ev-permit-sac-permit-solr2026-00249, ev-signal-sac-signal-solr2026-00249

Permit evidence

+15

Permit records increase confidence that work is moving toward execution.

Evidence: ev-permit-sac-permit-solr2026-00249

Real source record

+10

This recommendation is backed by a collected public source record, not only synthetic project data.

Evidence: sac-evidence-solr2026-00249

Trade fit

+8

Electrical is supported by 1 source-backed trade signal(s).

Evidence: sac-evidence-solr2026-00249

Known contractor

-8

A contractor is already named, so outreach should verify whether this scope remains open.

Evidence: ev-project-sac-solr2026-00249

Who To Contact

No source-supported contact information was found.

Next Action

Contact GIGAWATT CALIFORNIA LLC and verify whether the trade package is still open.

  • + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
  • + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
  • + At least one source-supported contact is available.

Confidence Breakdown

Resolution confidence 95%

Permit Evidence

86%

1 permit record(s) support the opportunity.

Planning Evidence

0%

Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.

Bid Evidence

0%

No SAM.gov bid evidence attached.

Source Agreement

75%

3 independent source family/families attached. Confidence increases when multiple sources agree.

Contacts

Primary Contact: GIGAWATT CALIFORNIA LLC

Developer

No contact information available

Builder

No contact information available

General Contractor

GIGAWATT CALIFORNIA LLC

Contractor - General Contractor

No contact information available

No contact information available

No contact information available

Architect

No contact information available

Engineer

No contact information available

Signals

Opportunity indicators detected before, during, and after permits.

SignalDateImportanceDescriptionSource
PermitJul 6, 202682Permit from Sacramento County permit SOLR2026-00249: AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)Sacramento County Permits

Permits

Supporting records, searchable and sortable.

SOLR2026-00249ResidentialJul 6, 2026$50,688Issued

Documents

TitleTypeDateSource
SOLR2026-00249 source recordSacramento County permit sourceJul 9, 2026Open source

Timeline

  1. Planning
  2. Proposed
  3. Approved
  4. Permitted
  5. Under Construction
  6. Completed

Evidence Panel

AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW

AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)

project - Sacramento County Permits - confidence 72%

Open source

SOLR2026-00249 Residential

AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)

source_record - Sacramento County Permits - confidence 90%

Open source

Residential SOLR2026-00249

Issued permit dated 2026-07-06.

permit - Permit record - confidence 86%

Open source

Permit

Permit from Sacramento County permit SOLR2026-00249: AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)

signal - Sacramento County Permits - confidence 82%

Open source

SOLR2026-00249 source record

AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)

document - Sacramento County permit source - confidence 76%

Open source

Map