AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW
Opportunity Score
55
Project Stage
Permitted
Timeline
0-6 months
Size / Value
Small / $50,688
Location
ANTELOPE, Sacramento County
Primary Contact
GIGAWATT CALIFORNIA LLC
Developer / Builder
No developer / No builder
Current Stage
Permitted
Updated Jul 9, 2026
Contractor-facing opportunity
No source-backed phone or email yet; access route research may still make this usable. · 5 evidence record(s) attached · Location is present · Project identity is present · Some access intelligence exists, but the contractor entry path is incomplete.
Fast Money Score
94
Contact Confidence
0%
Resolution Confidence
95%
Recommended Action
Research a direct phone for GIGAWATT CALIFORNIA LLC before calling about AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW.
Actionability
52
Contractor Score
31
Likely Scope
Electrical scope
Access Path
GC-driven
Subcontractor Likelihood
Unknown
Project Stage
Unknown
What To Say
Hi, this is [Name] with Twin Rivers. I'm calling about AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW. Who handles fence/gate subcontractor pricing for GIGAWATT CALIFORNIA LLC?
Additional intelligence not yet discovered: developer, phone.
Scope Intelligence
AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors…
Fence Scope
No Evidence
Fence Signal Score
0
Potential Scope
Unknown
Why Fencing Is Relevant
Primary scope is Solar / electrical. Incidental gate or fence mentions are not indicative of a bidable fencing opportunity.
- + Subdivision or community development evidence
No Evidence: 0 strong fence evidence signal(s), 0 weak signal(s), 1 total signal(s), 2 limiting signal(s), categories Housing, Utilities, Public Works, primary scope Solar / electrical, and only permit/opportunity metadata is available. Not bidable: Primary scope is Solar / electrical; no fencing evidence found.
Project Dossier
Document-extracted project intelligence. Evidence from source documents is preferred over permit metadata assumptions.
What Is Being Built
Electrical
Procurement Path
GC Relationship
Scope Summary
Electrical
Timeline
No bid or construction dates extracted from available documents yet.
Best Contact
GIGAWATT CALIFORNIA LLC · General Contractor
Source: Opportunity record
Supporting Evidence
“AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only) Electrical score 31: Small scope, unknown subcontractor likelihood, low opportunity size, unknown stage. Elect”
Source: Opportunity / permit record
Open source“TOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH”
Source: Opportunity / permit record
Open source“ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only) Electrical score”
Source: Opportunity / permit record
Open source“SS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only) Electrical score 31: Small scope, unknown subcontractor likelihood, low opportunity size, unknown st”
Source: Opportunity / permit record
Open source
Reviewed 3 source document(s). 0 remotely fetched. 1 scope item(s), 0 quantity signal(s), 4 trade evidence quote(s).
Project Dossier
AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)
Developer
Unknown
Applicant
Unknown
Primary Objective
Enable future residential construction.
Associated Improvements
- + Utility work
- + Residential development infrastructure
Work Categories
- + Utility work
- + Residential development infrastructure
Related Development
Related residential development identified
Why Fencing Is Relevant
Primary scope is Solar / electrical; no fencing evidence found.
No Evidence: 2 related evidence record(s), 0 positive evidence signal(s), and 1 negative evidence signal(s).
Best Available Contact
Highest-ranked source-backed route for reaching a human before falling back to procurement access.
Additional contact intelligence not yet discovered. Use the known access route or continue research before direct outreach.
Opportunity Analysis
Opportunity Score
55
Estimated timeline: 0-6 months
Fast Money score: 94
Reasoning
- + Project is still in a reachable stage: Permitted.
- + Permit activity suggests work may be approaching start.
Estimated Contractor Categories
Evidence
Caveats
- - A contractor is already identified in public records.
Generated Opportunity
Generated from collected signals and supporting evidence.
Trade
Electrical
Horizon
Fast Money
Score
75
Estimated Opportunity Value
Under $25k
Payment Potential
3-6 months
Revenue Reasoning
Confidence 78%$2,534 - $8,110
- + Based on permit valuation from source record.
- + Electrical matched source text or project characteristics.
- + Residential project type affects expected trade share.
Why This Trade
- + Solar, PV, or battery scope requires electrical work. (88%)
Transparent Score Explanation
Base opportunity
+30A normalized public project record exists.
Evidence: ev-project-sac-solr2026-00249, sac-evidence-solr2026-00249
Near-term horizon
+20Timing evidence places this in the 0-6 month Fast Money window.
Evidence: ev-permit-sac-permit-solr2026-00249, ev-signal-sac-signal-solr2026-00249
Permit evidence
+15Permit records increase confidence that work is moving toward execution.
Evidence: ev-permit-sac-permit-solr2026-00249
Real source record
+10This recommendation is backed by a collected public source record, not only synthetic project data.
Evidence: sac-evidence-solr2026-00249
Trade fit
+8Electrical is supported by 1 source-backed trade signal(s).
Evidence: sac-evidence-solr2026-00249
Known contractor
-8A contractor is already named, so outreach should verify whether this scope remains open.
Evidence: ev-project-sac-solr2026-00249
Who To Contact
No source-supported contact information was found.
Next Action
Contact GIGAWATT CALIFORNIA LLC and verify whether the trade package is still open.
- + Fast Money horizon was selected from project stage Permitted and 5 supporting evidence records.
- + Permit evidence exists, so contractor follow-up can be tied to a concrete public record.
- + At least one source-supported contact is available.
Confidence Breakdown
Resolution confidence 95%Permit Evidence
86%1 permit record(s) support the opportunity.
Planning Evidence
0%Planning confidence is based on planning, subdivision, rezoning, or CEQA signals.
Bid Evidence
0%No SAM.gov bid evidence attached.
Source Agreement
75%3 independent source family/families attached. Confidence increases when multiple sources agree.
Contacts
Developer
No contact information available
Builder
No contact information available
General Contractor
GIGAWATT CALIFORNIA LLC
Contractor - General Contractor
No contact information available
No contact information available
No contact information available
Architect
No contact information available
Engineer
No contact information available
Signals
Opportunity indicators detected before, during, and after permits.
| Signal | Date | Importance | Description | Source |
|---|---|---|---|---|
| Permit | Jul 6, 2026 | 82 | Permit from Sacramento County permit SOLR2026-00249: AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only) | Sacramento County Permits |
Permits
Supporting records, searchable and sortable.
| SOLR2026-00249 | Residential | Jul 6, 2026 | $50,688 | Issued |
Documents
| Title | Type | Date | Source |
|---|---|---|---|
| SOLR2026-00249 source record | Sacramento County permit source | Jul 9, 2026 | Open source |
Timeline
- Planning
- Proposed
- Approved
- Permitted
- Under Construction
- Completed
Evidence Panel
AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW
AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)
project - Sacramento County Permits - confidence 72%
SOLR2026-00249 Residential
AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)
source_record - Sacramento County Permits - confidence 90%
Residential SOLR2026-00249
Issued permit dated 2026-07-06.
permit - Permit record - confidence 86%
Permit
Permit from Sacramento County permit SOLR2026-00249: AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)
signal - Sacramento County Permits - confidence 82%
SOLR2026-00249 source record
AREA: R01: installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW - SolarApp ID: SA20260706-2133-285-12189-A; installation of NEW PHOTOVOLTAIC SYSTEM 7.92 KW DC/11.50 KW AC, WITH ESS, 18 panels - Residential Solar Permit, or Solar + ESS with SolarApp (SolarApp+ Contractors Only)
document - Sacramento County permit source - confidence 76%